BaBar forward endcap RPCs

BaBar forward endcap RPCs
复制标题

DOI:
10.1016/j.nima.2004.06.127
复制
发表时间:
2004-11
影响因子:
1.4
通讯作者:
G. Cavoto
G. Cavoto
中科院分区:
物理与天体物理3区
文献类型:
--
作者:
G. Cavoto

文献摘要

被引文献

相似文献

自1999年以来,BaBar探测器已经运行了超过2000平方米的电阻板室(RPC)作为μ子和中性强子探测器。最初生产的大多数RPC都经历了显著的效率损失,许多现在完全没有效率。因此,在2002年夏天,安装了最近生产的新RPC,以取代前端盖中的旧腔室。这里描述了前8个月的操作经验。
The BaBar detector has operated over 2000m2of resistive plates chambers (RPCs) as muon and neutral hadron detectors since 1999. Most of the RPCs of the original production underwent a significant efficiency loss and many are now completely inefficient. During the summer 2002 new RPCs from a recent production were therefore installed to replace the old chambers in the forward endcap. The experience of the first 8 months of operation is described here.