Study on the Anti-Seepage Reinforcement Scheme of Earth-Rock Dam for Changli Reservoir

Study on the Anti-Seepage Reinforcement Scheme of Earth-Rock Dam for Changli Reservoir
复制标题

DOI:
10.4028/www.scientific.net/amr.904.389
复制
发表时间:
2014-03
期刊:
Advanced Materials Research
影响因子:
--
通讯作者:
Xiandun Chai;Zhenzhong Shen;Baisong Nie
Xiandun Chai;Zhenzhong Shen;Baisong Nie
中科院分区:
其他
文献类型:
--
作者:
Xiandun Chai;Zhenzhong Shen;Baisong Nie

文献摘要

被引文献

相似文献

渗透破坏是引起土石坝溃坝的重要因素,因此病险水库的防渗加固研究一直是土石坝的重要课题。昌黎水库自建成以来,坝坡发生流土、管涌等事故,下游居民的生命财产安全受到威胁。通过对防渗加固方案效果的比较,结果表明,混凝土防渗墙对该粘土坝的渗流状态有明显改善作用,具有较高的运行稳定性。因此,混凝土防渗墙是昌黎水库推荐的防渗方案。
Seepage failure is an important factor in causing dam-break of earth-rock dam, so the study of anti-seepage reinforcement for dilapidated reservoirs is always an important topic to earth-rock dam. Changli reservoir, since the completion, soil flow and failure by piping occur in dam slopes, the safety of downstream residents has been threatened both in life and property. Based on the comparisons of the effects of anti-seepage reinforcement schemes,the result shows that, for this clay dam, concrete cut-off wall can improve the seepage state obviously and has a higher operational stability. Thus, the concrete cut-off wall is designated as the recommended anti-seepage scheme for Changli reservoir.