Motion planning of fork lift group in warehouse management - dynamical scheduling of arrangement work

Motion planning of fork lift group in warehouse management - dynamical scheduling of arrangement work
复制标题

仓库管理中叉车组的运动规划——布置工作的动态调度

DOI:
10.1109/rissp.2003.1285593
复制
发表时间:
2003
期刊:
IEEE International Conference on Robotics, Intelligent Systems and Signal Processing, 2003. Proceedings. 2003
影响因子:
--
通讯作者:
H. Tamura
H. Tamura
中科院分区:
--
文献类型:
--
作者:
T. Hara;T. Higashi;J. Ota;H. Tamura

文献摘要

被引文献

相似文献

在本文中,作为管理的第一步,在地面仓库的存储能力和可操作性,我们处理的调度分配叉车的安排工作。我们提出了一个算法,计算半最优解在实际时间为这个问题。该算法基于模拟退火算法,分为三层,每层的搜索域不同。针对离线规划阶段的模型误差和人工工作的不确定性,提出了在线重新规划的方法。仿真结果验证了该方法的有效性。
In this paper, as the first step of managing both storagability and operatability in the floor warehouse, we deal with a scheduling for assignment of forklifts on an arrangement work. We propose an algorithm that calculates a semi-optimal solution in practical time for this problem. This algorithm bases on simulated annealing and consists of three layers with a different search domain. We also propose methods of online re-planning against the model error in offline plan stage, and the uncertainty of human work. The validity of our method is verified in simulation.