Status of SPIRAL2 and RFQ Beam Commissioning
Status of SPIRAL2 and RFQ Beam Commissioning
复制标题
SPIRAL2 和 RFQ Beam 调试状态
DOI:
--
复制
发表时间:
2017
期刊:
影响因子:
--
通讯作者:
J. Biarrotte
中科院分区:
文献类型:
--
作者:
R. Ferdinand;G. Normand;O. Kamalou;P. Bertrand;F. Varenne;H. Frånberg;D. Uriot;M. Giacomo;J. Lagniel;A. Savalle;J. Biarrotte
The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.