Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
复制标题
DOI:
10.1016/j.ijpe.2010.10.005
复制
发表时间:
2012
影响因子:
12
通讯作者:
T. Cheng;Suh-Jenq Yang;Dar-Li Yang
中科院分区:
文献类型:
--
作者:
T. Cheng;Suh-Jenq Yang;Dar-Li Yang
Due-window assignment and production scheduling are important issues in operations management. In this study we investigate the problem of common due-window assignment and scheduling of deteriorating jobs and a maintenance activity simultaneously on a single-machine. We assume that the maintenance duration depends on its starting time. We provide polynomial time solutions for the problem and some of its special cases, where the objective is to simultaneously minimize the earliness, tardiness, due-window starting time, and due-window size costs.