Considering Interdependencies of KPIs – Possible Resource Efficiency and Effectiveness Improvements
Considering Interdependencies of KPIs – Possible Resource Efficiency and Effectiveness Improvements
复制标题
考虑 KPI 的相互依赖性 – 可能的资源效率和有效性改进
DOI:
10.1016/j.promfg.2017.02.038
复制
发表时间:
2017
期刊:
影响因子:
--
通讯作者:
Dornfeld
中科院分区:
文献类型:
--
作者:
Stricker;Micali;Dornfeld
When an assembly line experiences downtime, it incurs both financial and productivity costs, in addition to environmental costs resulting from inefficient or ineffective uses of resources. Material is wasted in the form of scrapped work in progress (WIP), and energy is wasted in powering idle machines and facilities while the line is restored to an operational state. This work performs an analysis of 20 key performance indicators (KPIs) to investigate their potential impacts in maximizing the uptime of a simulated assembly line with automation and quality inspection. Previous work has not considered the linkages between baseline KPIs. The interdependencies and effects of baseline KPIs such as preventative maintenance time, corrective maintenance time, time to failure, and others are explored in order to analyze the production system on a more granular level. The results of this work inform production planning efforts and enable more effective and sustainable operation.
登录
查看更多内容
DOI:
10.1063/1.1487535
发表时间:
2002
期刊:
Controlling und Management
影响因子:
--
作者:
B. Scholz;M. Freitag;A. Schmieder
通讯作者:
A. Schmieder
DOI:
10.4028/www.scientific.net/amr.1018.589
发表时间:
2014
期刊:
Advanced Materials Research
影响因子:
--
作者:
K. Knüppel;I. Nikitin
通讯作者:
I. Nikitin
影响因子:
9.2
作者:
Arif Kuyumcu
通讯作者:
Arif Kuyumcu
DOI:
10.1007/978-3-662-11004-1
发表时间:
1990
期刊:
Controlling und Management
影响因子:
--
作者:
B. Bertsche;G. Lechner
通讯作者:
G. Lechner