Performance of water cut-off and remediation promotion techniques at coastal waste landfill sites

Performance of water cut-off and remediation promotion techniques at coastal waste landfill sites
复制标题

滨海垃圾填埋场断水修复促进技术效果

DOI:
10.1007/s10163-013-0207-9
复制
发表时间:
2014
影响因子:
3.1
通讯作者:
T.
T.
中科院分区:
环境科学与生态学4区
文献类型:
--
作者:
5)Inazumi;S. and Kakuda;T.

文献摘要

相似文献

本文提出了建设钢管板桩防渗墙,以促进水溶性有毒物质的修复和遏制水溶性有毒物质在垃圾填埋场,以维护和确保垃圾填埋场的环境安全随着时间的推移。它调查了沿海废物填埋场的环境安全,方法是对为废物填埋场提供海岸保护的SPSP隔水墙的连接部分应用隔水和补救促进技术。研究结果表明,将截水修复技术应用于SPSP防渗墙的结构节点H-H节点,可以构建具有水溶性有毒物质遏制和修复促进功能的SPSP防渗墙。此外,他们表明,修复在H-H接头的性能可以通过调整的H-H接头法兰的截水效率进行控制。
This paper proposes the construction of steel pipe sheet pile (SPSP) cutoff walls for promoting remediation of water-soluble toxic substances and containment of water-soluble toxic substances at landfill sites in order to maintain and ensure the environmental safety of waste landfill sites over time. It investigates environmental safety at coastal waste landfill sites by applying water cut-off and remediation promotion techniques to the joint sections of SPSP water cut-off walls that provide shore protection for waste landfills. Results from the research herein show that the construction of SPSP water cut-off walls with features such as the containment of water-soluble toxic substances and remediation promotion is possible by applying water cut-off and remediation techniques to H–H joints, which are structural joint components of SPSP walls. In addition, they show that the performance of remediation in H–H joints can be controlled by adjusting the water cut-off efficiency of the H–H joint flange.