A lower hybrid current drive system for ITER

A lower hybrid current drive system for ITER
复制标题

DOI:
10.1088/0029-5515/49/7/075001
复制
发表时间:
2009-07
期刊:
影响因子:
3.3
通讯作者:
G. Hoang;A. Becoulet;J. Artaud;G. Berger-by;J. Decker;L. Delpech;A. Ekedahl;Jmv Garcia;G. Giruzzi;M. Goniche;D. Guilhem;J. Hillairet;F. Imbeaux;X. Litaudon;R. Magne;Y. Peysson;M. Schneider;J. Jacquinot;Y. Bae;B. Beaumont;J. Belo;J. Bizarro;P. Bonoli;M. Cho;F. Kazarian;C. Kessel;S. H. Kim;J. Kwak;J. Jeong;J. B. Lister;S. Milora;F. Mirizzi;R. Maggiora;D. Milanesio;W. Namkung;J. Noterdaeme;Seungil Park;R. Parker;David A Rasmussen;P. K. Sharma;A. Tanga;A. Tuccillo;Yuanxi Wan
G. Hoang;A. Becoulet;J. Artaud;G. Berger-by;J. Decker;L. Delpech;A. Ekedahl;Jmv Garcia;G. Giruzzi;M. Goniche;D. Guilhem;J. Hillairet;F. Imbeaux;X. Litaudon;R. Magne;Y. Peysson;M. Schneider;J. Jacquinot;Y. Bae;B. Beaumont;J. Belo;J. Bizarro;P. Bonoli;M. Cho;F. Kazarian;C. Kessel;S. H. Kim;J. Kwak;J. Jeong;J. B. Lister;S. Milora;F. Mirizzi;R. Maggiora;D. Milanesio;W. Namkung;J. Noterdaeme;Seungil Park;R. Parker;David A Rasmussen;P. K. Sharma;A. Tanga;A. Tuccillo;Yuanxi Wan
中科院分区:
物理与天体物理1区
文献类型:
--
作者:
G. Hoang;A. Becoulet;J. Artaud;G. Berger-by;J. Decker;L. Delpech;A. Ekedahl;Jmv Garcia;G. Giruzzi;M. Goniche;D. Guilhem;J. Hillairet;F. Imbeaux;X. Litaudon;R. Magne;Y. Peysson;M. Schneider;J. Jacquinot;Y. Bae;B. Beaumont;J. Belo;J. Bizarro;P. Bonoli;M. Cho;F. Kazarian;C. Kessel;S. H. Kim;J. Kwak;J. Jeong;J. B. Lister;S. Milora;F. Mirizzi;R. Maggiora;D. Milanesio;W. Namkung;J. Noterdaeme;Seungil Park;R. Parker;David A Rasmussen;P. K. Sharma;A. Tanga;A. Tuccillo;Yuanxi Wan

文献摘要

被引文献

相似文献

20兆瓦/5千兆赫低杂波电流驱动(LHCD)系统最初预定用于热核实验堆第二次使命,即Q = 5稳态目标。虽然不是目前计划采购阶段的一部分,但目前正在考虑提前交付。本文对物理概念设计和技术概念设计进行了综述。此外,还制定了适当的工作计划。这一关于在热核实验堆上设计、研发、采购和安装20兆瓦低杂波驱动系统的工作计划遵循热核实验堆科学和技术咨询委员会(STAC)T13-05任务说明。它更详细地介绍了该系统所涉各种科学和技术问题,但没有假定热核实验堆可能的伙伴之间分担任何工作或采购b。本文件不对各作者的机构或国内机构作出这方面的承诺。
A 20 MW/5 GHz lower hybrid current drive (LHCD) system was initially due to be commissioned and used for the second mission of ITER, i.e. the Q = 5 steady state target. Though not part of the currently planned procurement phase, it is now under consideration for an earlier delivery. In this paper, both physics and technology conceptual designs are reviewed. Furthermore, an appropriate work plan is also developed. This work plan for design, R&D, procurement and installation of a 20 MW LHCD system on ITER follows the ITER Scientific and Technical Advisory Committee (STAC) T13-05 task instructions. It gives more details on the various scientific and technical implications of the system, without presuming on any work or procurement sharing amongst the possible ITER partnersb The LHCD system of ITER is not part of the initial cost sharing.. This document does not commit the Institutions or Domestic Agencies of the various authors in that respect.