Assessment on Impact of Xiluodu on Sediment Deposition in Three Gorges Reservoir

Assessment on Impact of Xiluodu on Sediment Deposition in Three Gorges Reservoir
复制标题

DOI:
--
复制
发表时间:
2002
期刊:
China Three Gorges Construction
影响因子:
--
通讯作者:
H. Yue
H. Yue
中科院分区:
其他
文献类型:
--
作者:
H. Yue

文献摘要

被引文献

相似文献

利用水库泥沙淤积的一维数学模型,通过计算和分析,评价三峡水库的泥沙淤积可减少约3%。与未来的溪洛渡项目联合运行50年,相比没有后一个项目,效果显著,特别是在回水变化带内减少沉积,水位下降至少1。在不同的洪水频率下,重庆市区沿江段5米左右。
It has been evaluated by calculation and analysis with one-dimensional mathematic model of the reservoir sediment deposition that the sediment deposition volume in the Three Gorges reservoir could be decreased by some 3. 7 billion t when jointly operating for 50 years with the prospective Xiluodu project, compared with that without the later project, with an remarkable effect especially on deposition reduction within the backwater change zone and water level fall down of at least 1. 5 m or so along the river stretch of downtown of the Chongqing at various flood frequencies.