Closure to “safety risk identification and assessment for Beijing Olympic venues construction” by Yu Sun, Dongping Fang, Shouqing Wang, Mengdong Dai and Xiaoquan Lv January 2008, Vol.24, No. 1, pp. 40-47, DOI: 10.1061/(ASCE)0742-597X(2008)24:1(40).
Closure to “safety risk identification and assessment for Beijing Olympic venues construction” by Yu Sun, Dongping Fang, Shouqing Wang, Mengdong Dai and Xiaoquan Lv January 2008, Vol.24, No. 1, pp. 40-47, DOI: 10.1061/(ASCE)0742-597X(2008)24:1(40).
复制标题
《北京奥运会场馆建设安全风险识别与评估》结束,作者:孙宇、方东平、王守清、戴孟栋、吕晓泉,2008 年 1 月,第 24 卷,第 1 期,第 40-47 页,DOI
DOI:
--
复制
发表时间:
--
期刊:
影响因子:
--
通讯作者:
方东平
中科院分区:
文献类型:
--
作者:
孙煜;吕小泉;戴孟东;王守清;方东平