Performance of Tilt-Up Buildings in the October 1, 1987 Whittier Narrows Earthquake: Data Collection and Analysis

1987 年 10 月 1 日惠蒂尔海峡地震中倾斜式建筑的性能:数据收集和分析

基本信息

  • 批准号:
    8804291
  • 负责人:
  • 金额:
    $ 2.99万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    1988
  • 资助国家:
    美国
  • 起止时间:
    1988-02-15 至 1989-07-31
  • 项目状态:
    已结题

项目摘要

On October 1, 1987 the Whittier Narrows Earthquake struck approximately 10 miles east of downtown Los Angeles, California. This very well instrumented region includes thousands of tilt-up buildings of varying ages which experienced strong motions and in some cases, significant amounts of damage. Starting the day of the earthquake perishable performance data on approximately 120 tilt-up structures were collected throughout the area. This research project collates the performance data and conducts statistical analyses of it. Detailed performance and structural data are collected for the more seriously damaged structures. Special attention is paid to the relative performance of pre- and post-San Fernando Earthquake structures in order to evaluate seismic code provisions intended to eliminate deficiencies identified in the 1971 event. The documentation of these data will prove invaluable in highlighting serious design and construction problems common to these buildings and in improving the accuracy of future damage estimates. This is desirable because the construction type is very popular for low-rise commercial and industrial buildings and houses many strategic industries.
1987年10月1日,加利福尼亚州洛杉矶市中心以东约10英里处发生了惠蒂尔海峡地震。这一地区仪器设备齐全,包括数千座不同年代的倾斜建筑,这些建筑经历了强烈的运动,在某些情况下,造成了严重的破坏。从地震当天开始,在整个地区收集了大约120个倾斜结构的易腐性能数据。本课题对绩效数据进行整理和统计分析。对于损坏较严重的结构,收集了详细的性能和结构数据。特别关注圣费尔南多地震前后结构的相对性能,以便评估旨在消除1971年事件中发现的缺陷的抗震规范规定。这些数据的文件在突出这些建筑物普遍存在的严重设计和建造问题以及提高今后损失估计的准确性方面将证明是无价的。这是可取的,因为这种建筑类型非常受低层商业和工业建筑的欢迎,并容纳许多战略工业。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Ronald Hamburger其他文献

Ronald Hamburger的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Ronald Hamburger', 18)}}的其他基金

Response of Low Rise Industrial and Commercial Buildings to Near Field Ground Motion
低层工商建筑​​对近场地震动的响应
  • 批准号:
    9416232
  • 财政年份:
    1994
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant

相似国自然基金

全局 Hölder tilt-稳定性与度量正则性
  • 批准号:
    11801497
  • 批准年份:
    2018
  • 资助金额:
    19.0 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

Bed Rest and Interstitial Norepinephrine at Head Up Tilt
卧床休息和间质去甲肾上腺素(抬头倾斜)
  • 批准号:
    7044413
  • 财政年份:
    2003
  • 资助金额:
    $ 2.99万
  • 项目类别:
Evaluation of Repair and Rehabilitation Strategies for Tilt-Up Construction
倾斜施工修复和修复策略的评估
  • 批准号:
    9416354
  • 财政年份:
    1994
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant
Evaluation of Repair and Rehabilitation Strategies for Tilt-Up Construction
倾斜施工修复和修复策略的评估
  • 批准号:
    9416449
  • 财政年份:
    1994
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant
Experimental Evaluation of Retrofit Mechanisms for Precast R/C Tilt-up Wall-Foundation Connections
预制 R/C 倾斜墙体基础连接改造机构的实验评价
  • 批准号:
    9120407
  • 财政年份:
    1991
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant
Evaluation and Repair of Concrete Tilt-up Systems
混凝土倾斜系统的评估和修复
  • 批准号:
    9120281
  • 财政年份:
    1991
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Continuing Grant
Evaluation of Tilt-Up-Wall Structural Systems Affected by the Whittier Narrows Earthquake of October 1, 1987
受 1987 年 10 月 1 日惠蒂尔海峡地震影响的倾斜墙结构系统评估
  • 批准号:
    8803723
  • 财政年份:
    1988
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant
Survey of Tilt-Up-Wall Structural Systems Affected by the Whittier Narrows Earthquake of October 1, 1987
受 1987 年 10 月 1 日惠蒂尔海峡地震影响的倾斜墙结构系统调查
  • 批准号:
    8802791
  • 财政年份:
    1987
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant
Experimental Data Based Models for Seismic Tilt-Up Wall Design
基于实验数据的抗震倾斜墙设计模型
  • 批准号:
    8320397
  • 财政年份:
    1984
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Continuing Grant
Guidelines for Mitigation of Seismic Hazards in Tilt-Up-WallStructures: Phase II
倾斜墙结构地震灾害缓解指南:第二阶段
  • 批准号:
    8114457
  • 财政年份:
    1981
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Continuing Grant
Guidelines For Mitigation of Seismic Hazards in Tilt-Up-Wall Structures
倾斜墙结构地震灾害减轻指南
  • 批准号:
    8009736
  • 财政年份:
    1980
  • 资助金额:
    $ 2.99万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了