课题基金 / 基金详情

End-Plate and All-Bolted Moment Connections for Seismic Loading

End-Plate and All-Bolted Moment Connections for Seismic Loading
用于地震载荷的端板和全螺栓力矩连接
批准号:
9416171
负责人:
Thomas Murray
金额:
$6.5万
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1994
资助国家:
美国
项目状态:
已结题
起止时间:
1994-09-01 至 1996-08-31

项目摘要

项目成果

Thomas Murray的其他基金

相似基金

相关文献

中文摘要
翻译
9416171--北岭地震后,大量关于钢结构抗弯框架梁翼缘-柱翼缘焊接断裂的报道表明,需要一种新的连接结构。目前尚无端板弯矩连接损坏或故障的报告。在本项目中,将对端板和全螺栓弯矩连接进行研究,以开发一种替代现场焊接连接的连接方式。由于这两种连接类型都需要拉紧螺栓以及与撬力相关的问题,因此垫板放置在梁拉伸翼缘或T形三通拉伸腹板的对面。使用垫片确保螺栓张力不会增加,直到端板或T形三通桩法兰和立柱法兰分离。如果设计的预紧力足以发展连接梁的强度,则实际上是在拧紧螺栓时对连接进行测试。该项目由三个任务组成:任务I是一项调查,以确定端板或全螺栓弯矩连接是否因北岭地震而出现损坏或故障。任务二是开发垫片端板和全螺栓弯矩连接的设计程序,这是一个相对简单的程序,因为不需要考虑撬力的影响。任务III是一组四个验证测试,每个连接类型两个。每组中的一个测试将设计为连接为控制极限状态,第二个测试为梁的控制极限状态。成功完成拟议的研究将导致钢梁柱弯矩连接,这种连接不需要焊接,但具有足够的强度来抵御地震事件的大作用力。这是一个北岭地震项目。***
英文摘要
9416171 Murray Numerous reports of fractures in beam flange-to-column flange welds in steel moment resisting frames after the Northridge earthquake suggest the need for a new connection configuration. No reports of end-plate moment connection distress or failure are known. In this project the endplate and all-bolted moment connections will be studied to develop an alternate to field welded connections. Because both of these connection types require tension bolts and the associated problems with prying forces, a shim plate is placed opposite the beam tension flange or the tee-stub tension web. Using the shim ensures that the bolt tension will not increase until separation of the end-plate or tee stub flange and the column flange occurs. If the design is such that the pretension force is sufficient to develop the strength of the connected beam, in effect the connection is tested at the time the bolts are tightened. The project consists of three tasks: Task I is a survey to determine if end-plate or all-bolted moment connections exhibited distress or failure because of the Northridge earthquake. Task II is the development of a design procedure for shimmed end-plate and all-bolted moment connections, which is a relatively uncomplicated procedure because the effects of prying forces do not need to be considered. Task III is a set of four verification tests, two for each connection type. One test in each set will be designed so the connection is the controlling limit state and the second so the beam is controlling limit state. Successful completion of the proposed research will result in a steel beam-to-column moment connection which does not require welding but with sufficient strength to resist large forces from seismic events. This is a Northridge Earthquake project. ***
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
A Study of Nonlinear Magneto-Rheological Tuned Vibration Absorbers for Reducing Floor Vibrations
The Use of an Automated Ion Analyzer in an Environmental Science Curriculum
  • 批准号:
    9550818
  • 项目类别:
    Standard Grant
  • 资助金额:
    $1.8万
  • 财政年份:
    1995
  • 负责人:
    Thomas Murray
  • 依托单位:
Washington State Manufacturing Technology Standards, Competencies and Curriculum Development
  • 批准号:
    9453739
  • 项目类别:
    Standard Grant
  • 资助金额:
    $0.0万
  • 财政年份:
    1994
  • 负责人:
    Thomas Murray
  • 依托单位:
Control of Occupant-Induced Floor Motion
国内基金
海外基金
基于ITS探讨软骨下骨rod-plate微结构重塑在骨关节炎发病机制中的作用
  • 批准号:
    81601930
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    18.0万元
  • 批准年份:
    2016
  • 负责人:
    陈炎
  • 依托单位: