课题基金 / 基金详情

Postdoc: Parallel Implementation of Modeling & Analyis of the Terrestrial Ecosystems' Response to the Changing Global Climate

Postdoc: Parallel Implementation of Modeling & Analyis of the Terrestrial Ecosystems' Response to the Changing Global Climate
博士后:建模的并行实现
批准号:
9625799
负责人:
Jery Stedinger
金额:
$4.62万
依托单位:
依托单位国家:
美国
项目类别:
Standard Grant
财政年份:
1996
资助国家:
美国
项目状态:
已结题
起止时间:
1996-09-15 至 2000-08-31

项目摘要

项目成果

Jery Stedinger的其他基金

相似基金

相关文献

中文摘要
翻译
这个项目涉及三个方面。首先,它将试图在全球范围内调查全球气候变化对陆地生态系统的影响;其次,它将使用连接SP2平台的新IBM高性能存储系统(HPCC)的并行机制来处理来自植被遥感的海量数据集;以及第三,它将设计用于生态系统建模的并行算法。所有这三个方面都将结合起来,以解决以下科学问题。至少自20世纪70年代中期以来,CO2浓度的季节幅度一直在增加,这表明通过光合作用吸收CO_2,通过呼吸释放CO_2。此外,季节曲线的低谷出现在季节较早的时候,二氧化碳下降的速度更快。假设这些现象是由气温变暖和降水变化引起的,特别是自20世纪70年代中期以来S以来,PI建议利用通过遥感技术和地面记录获得的大量数据集来研究气候变量、陆地生态系统和大气CO2浓度之间的相互作用。
英文摘要
This project involves three aspects. First, it will attempt to investigate the impacts of the changing global climate on terrestrial ecosystems at global scale; second, it will tackle the handling of massive data sets from remote sensing of vegetation using parallel mechanisms employing the new IBM High Performance Storage System (HPCC) connecting the SP2 platform; and third; it will design parallel algorithms for ecosystems modeling. All three aspects will be integrated to address the following scientific questions. The seasonal amplitude of CO2 concentration has been increasing since at least the mid 1970's, suggesting an increase in CO2 absorption through photosynthesis and CO2 release through respiration. In addition, the trough of the seasonal curve has been occurring earlier in the season, with the CO2 draw down occurring faster. Assuming these phenomena are caused by the warming temperature and changing patterns in precipitation especially since mid-1970's, the PIs propose to study the interaction among climatic variables, terrestrial ecosystems, and atmospheric CO2 concentrations employing the massive datasets available through remote sensing technology and ground records.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Presidential Young Investigator Award: Water Resource System Operation and Flood Risk Interaction
  • 批准号:
    8351819
  • 项目类别:
    Continuing Grant
  • 资助金额:
    $31.5万
  • 财政年份:
    1984
  • 负责人:
    Jery Stedinger
  • 依托单位:
Stochastic Streamflow Models: Validation and Parameter Uncertainty
  • 批准号:
    8010889
  • 项目类别:
    Standard Grant
  • 资助金额:
    $0.0万
  • 财政年份:
    1981
  • 负责人:
    Jery Stedinger
  • 依托单位:
Research Initiation - Frequency Curves For Natural Events
  • 批准号:
    7908193
  • 项目类别:
    Standard Grant
  • 资助金额:
    $0.0万
  • 财政年份:
    1979
  • 负责人:
    Jery Stedinger
  • 依托单位:
国内基金
海外基金
强流低能加速器束流损失机理的Parallel PIC/MCC算法与实现