Order of Magnitude Instruction Level Parallelism
数量级指令级并行性
基本信息
- 批准号:9708183
- 负责人:
- 金额:$ 30万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Continuing Grant
- 财政年份:1997
- 资助国家:美国
- 起止时间:1997-07-15 至 2002-06-30
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
This project is exploring a new approach to instruction-level parallelism. The new approach, disjoint eager execution, uses branch prediction and eager execution to maximize the number of instructions that can be usefully executed on each cycle. The set of branch paths forms a tree, in which each node represents a branch instruction and each edge represents the code executed between branches. In disjoint eager execution, all of the most likely code segments are candidates for speculative execution, rather than only those code segments on the most likely path. In other words, a subtree of instructions is executed that may not be a simple chain. Preliminary research has included some simulations on benchmarks suggesting that speedup of about 30 is possible. This project includes more comprehensive simulations to determine the benefits, along with architectural studies to determine the effects of parallelism on cycle time of the machine.
这个项目正在探索一种指令级并行的新方法。这种新的方法,即不接合急切执行,利用分支预测和急切执行来最大化每个循环中可以有效执行的指令数量。分支路径的集合形成一棵树,其中每个节点代表一个分支指令,每个边代表分支之间执行的代码。在不相交的急切执行中,所有最有可能的代码段都是推测执行的候选者,而不仅仅是那些最可能路径上的代码段。换句话说,执行的指令子树可能不是一个简单的链。初步研究包括对基准的一些模拟,表明大约30的加速是可能的。该项目包括更全面的模拟,以确定好处,以及架构研究,以确定并行性对机器周期时间的影响。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Augustus Uht其他文献
Augustus Uht的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Augustus Uht', 18)}}的其他基金
CISE Research Instrumentation: Equipment for Diverse Computer Architecture Research
CISE 研究仪器:用于多种计算机架构研究的设备
- 批准号:
9729839 - 财政年份:1998
- 资助金额:
$ 30万 - 项目类别:
Standard Grant
Equipment for ICED - Integrated Computer-Engineering Design Curriculum
ICED 设备 - 综合计算机工程设计课程
- 批准号:
9751215 - 财政年份:1997
- 资助金额:
$ 30万 - 项目类别:
Standard Grant
The Analysis, Measurement and Exploitation of Eager Evaluation in Imperative Instruction Streams
命令式指令流中热切评估的分析、测量和开发
- 批准号:
8910586 - 财政年份:1989
- 资助金额:
$ 30万 - 项目类别:
Standard Grant
相似海外基金
Constraints on the tempo and magnitude of explosive volcanism: facilitating long-term ash fall hazard assessments
对爆发性火山活动的速度和强度的限制:促进长期火山灰坠落危险评估
- 批准号:
MR/Y011767/1 - 财政年份:2024
- 资助金额:
$ 30万 - 项目类别:
Fellowship
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425431 - 财政年份:2024
- 资助金额:
$ 30万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425430 - 财政年份:2024
- 资助金额:
$ 30万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425429 - 财政年份:2024
- 资助金额:
$ 30万 - 项目类别:
Standard Grant
NSF-NERC: Geological History Constraints on the Magnitude of Grounding Line Retreat in the Thwaites Glacier System
NSF-NERC:地质历史对思韦茨冰川系统接地线后退幅度的限制
- 批准号:
2317097 - 财政年份:2023
- 资助金额:
$ 30万 - 项目类别:
Continuing Grant
Ice nucleating particles from blizzards above sea ice - magnitude and climate impacts of a potential particle source in a warming world.
海冰上方暴风雪产生的冰核颗粒——变暖世界中潜在颗粒源的强度和气候影响。
- 批准号:
2885505 - 财政年份:2023
- 资助金额:
$ 30万 - 项目类别:
Studentship
Historical Development of Astrophotometry and Standardization of the Magnitude Scales in Nineteenth-century Astronomy and Astrophysics
天文测光法的历史发展和十九世纪天文学和天体物理学中星等尺度的标准化
- 批准号:
22KJ1125 - 财政年份:2023
- 资助金额:
$ 30万 - 项目类别:
Grant-in-Aid for JSPS Fellows
Understanding of frequency-magnitude distribution in terms of the BK model and the interaction among heat, fluid pressure, and porosity
根据 BK 模型理解频率-幅度分布以及热量、流体压力和孔隙率之间的相互作用
- 批准号:
23K03554 - 财政年份:2023
- 资助金额:
$ 30万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Development of a Prediction and Evaluation Method for Load Initiation Timing and Load Magnitude in Femoral Shaft Fractures Using Finite Element Analysis
利用有限元分析开发股骨干骨折载荷启动时间和载荷大小的预测和评估方法
- 批准号:
23K08691 - 财政年份:2023
- 资助金额:
$ 30万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Doctoral Dissertation Research: The impact of permafrost thaw on the fate and magnitude of carbon aquatic transport from Arctic tundra soil
博士论文研究:永久冻土融化对北极苔原土壤碳水运输的命运和程度的影响
- 批准号:
2310630 - 财政年份:2023
- 资助金额:
$ 30万 - 项目类别:
Standard Grant