Response of Precast Construction in Turkey during the 1999 Earthquakes

1999 年地震期间土耳其预制建筑的应对措施

基本信息

  • 批准号:
    0085337
  • 负责人:
  • 金额:
    $ 7.5万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2000
  • 资助国家:
    美国
  • 起止时间:
    2000-08-15 至 2002-07-31
  • 项目状态:
    已结题

项目摘要

ABSTRACTResponse of Precast Construction in Turkey during the 1999 EarthquakesThe 1998 Turkish Seismic Code permits four types of precast construction: moment-resisting frames, single-story hinged frames, structural wall panels, and combinations of precast moment-resisting frames with cast-in-place structural walls (solid or coupled). Single-story hinged frames are used throughout Turkey for industrial facilities. This type of structural system has not performed well in recent earthquakes, including the 1992 event in Erzincan, the 1998 event in Ceyhan, and the recent events near Izmit and Duzce.Recent experience has shown that precast structures in the U.S. are also vulnerable to earthquake damage. Parking structures were sustained damage at higher than anticipated levels during the 1994 Northridge earthquake. Only after detailed evaluation of precast parking structures in the Los Angeles area were the causes of the damage identified. Many factors that contributed to the observed response were not considered in the governing building codes. The goal of the proposed work is to collect detailed information about the structural configuration and connection details from damaged and undamaged precast buildings in the region of Turkey affected by the 17 August and 12 November 1999 earthquakes. Data collected will be evaluated with the goal of reducing the seismic vulnerability of precast construction in both the U.S. and Turkey.
1998年土耳其地震规范允许四种类型的预制结构:抗弯框架、单层铰接框架、结构墙板以及预制抗弯框架与现浇结构墙(实心或耦合)的组合。 单层铰接框架在土耳其各地用于工业设施。 这种类型的结构体系在最近的地震中表现不佳,包括1992年的埃尔津坎地震、1998年的杰伊汉地震以及最近伊兹米特和杜兹切附近的地震。最近的经验表明,美国的预制结构也容易受到地震破坏。 在1994年北岭地震中,停车场结构遭受的破坏程度高于预期。 只有在对洛杉矶地区的预制停车场结构进行详细评估后,才确定了损坏的原因。 许多导致观察到的反应的因素在管理建筑规范中没有考虑。 拟议工作的目标是从土耳其地区受1999年8月17日和11月12日地震影响的受损和未受损预制建筑物中收集有关结构配置和连接细节的详细信息。 收集的数据将进行评估,以减少美国和土耳其预制建筑的地震脆弱性。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Sharon Wood其他文献

Modeling the Performance of Children on the Attentional Network Test
模拟儿童在注意力网络测试中的表现
  • DOI:
  • 发表时间:
    2009
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Fehmida Hussain;Sharon Wood
  • 通讯作者:
    Sharon Wood
Modelling the Efficiencies and Interactions of Attentional Networks
注意力网络的效率和交互建模
  • DOI:
    10.1007/978-3-642-00582-4_11
  • 发表时间:
    2009
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Fehmida Hussain;Sharon Wood
  • 通讯作者:
    Sharon Wood
Usui Reiki in an Ambulatory Surgery Center
  • DOI:
    10.1016/j.jopan.2013.04.113
  • 发表时间:
    2013-06-01
  • 期刊:
  • 影响因子:
  • 作者:
    Ann Hyland;Reiki Master;Sharon Wood;Mary Burk;Sandy Gehlfus;Mary Ann Artino;Maureen Vlach;Erin Hill;Carol Thielman;Ann Hess;Noreen Joyce
  • 通讯作者:
    Noreen Joyce
Berg Balance Scale
伯格平衡量表
  • DOI:
    10.1037/t28729-000
  • 发表时间:
    2014
  • 期刊:
  • 影响因子:
    112.7
  • 作者:
    Katherine Berg;Sharon Wood;Jack I. Williams;D. Gayton
  • 通讯作者:
    D. Gayton
Attention design: Eight issues to consider
注意力设计:需要考虑的八个问题
  • DOI:
  • 发表时间:
    2006
  • 期刊:
  • 影响因子:
    9.9
  • 作者:
    Sharon Wood;R. Cox;P. Cheng
  • 通讯作者:
    P. Cheng

Sharon Wood的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Sharon Wood', 18)}}的其他基金

Collaborative Research: Demonstration of NEES for Studying Soil-Foundation-Structure Interaction
合作研究:用于研究土-地基-结构相互作用的 NEES 演示
  • 批准号:
    0324326
  • 财政年份:
    2003
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Continuing Grant
Workshop on Advanced Sensor Technology for Civil Engineering Systems
土木工程系统先进传感器技术研讨会
  • 批准号:
    0095237
  • 财政年份:
    2001
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Standard Grant
Development of a Wireless Sensor to Detect Cracks in Welded Steel Connections
开发用于检测焊接钢连接裂纹的无线传感器
  • 批准号:
    0000027
  • 财政年份:
    2000
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Standard Grant
Evaluation of Repair and Rehabilitation Strategies for Tilt-Up Construction
倾斜施工修复和修复策略的评估
  • 批准号:
    9416354
  • 财政年份:
    1994
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Standard Grant
Experimental Investigation of the Strength Stiffness and Deformaton Capacity of Slender Reinforced Concrete Walls
细长钢筋混凝土墙强度刚度及变形能力试验研究
  • 批准号:
    8912992
  • 财政年份:
    1989
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Standard Grant

相似海外基金

Assembly and Connection of Precast/Prestressed Concrete Members - Validation and Optimization of two Accelerated Construction Methods
预制/预应力混凝土构件的组装和连接 - 两种加速施工方法的验证和优化
  • 批准号:
    531188-2018
  • 财政年份:
    2020
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Collaborative Research and Development Grants
Study of adjacent precast prestressed box beam bridges for accelerated bridge construction
相邻预制预应力箱梁桥加速桥梁施工的研究
  • 批准号:
    542499-2019
  • 财政年份:
    2019
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Alexander Graham Bell Canada Graduate Scholarships - Master's
Assembly and Connection of Precast/Prestressed Concrete Members - Validation and Optimization of two Accelerated Construction Methods
预制/预应力混凝土构件的组装和连接 - 两种加速施工方法的验证和优化
  • 批准号:
    531188-2018
  • 财政年份:
    2019
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Collaborative Research and Development Grants
Assembly and Connection of Precast/Prestressed Concrete Members - Validation and Optimization of two Accelerated Construction Methods**
预制/预应力混凝土构件的组装和连接 - 两种加速施工方法的验证和优化**
  • 批准号:
    531188-2018
  • 财政年份:
    2018
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Collaborative Research and Development Grants
Development of simplified method of analysis for adjacent precast deck-free concrete box girder bridges applied in accelereated bridge construction
加速桥梁施工中相邻预制无桥面板混凝土箱梁桥简化分析方法的发展
  • 批准号:
    469476-2014
  • 财政年份:
    2016
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Industrial R&D Fellowships (IRDF)
Development of simplified method of analysis for adjacent precast deck-free concrete box girder bridges applied in accelereated bridge construction
加速桥梁施工中相邻预制无桥面板混凝土箱梁桥简化分析方法的发展
  • 批准号:
    469476-2014
  • 财政年份:
    2015
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Industrial R&D Fellowships (IRDF)
Behaviour of lifting inserts for precast concrete construction
预制混凝土建筑提升嵌件的性能
  • 批准号:
    LP110100008
  • 财政年份:
    2011
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Linkage Projects
Precast concrete foundation system for residential construction
住宅建筑预制混凝土基础系统
  • 批准号:
    335351-2005
  • 财政年份:
    2010
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Collaborative Research and Development Grants
Precast concrete foundation system for residential construction
住宅建筑预制混凝土基础系统
  • 批准号:
    335351-2005
  • 财政年份:
    2008
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Collaborative Research and Development Grants
Precast concrete foundation system for residential construction
住宅建筑预制混凝土基础系统
  • 批准号:
    335351-2005
  • 财政年份:
    2007
  • 资助金额:
    $ 7.5万
  • 项目类别:
    Collaborative Research and Development Grants
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了