Collaborative Research: Analysis of Seismicity Associated with the Mw=8.8 2010 Maule Earthquake and Implications for Subduction Processes

合作研究:2010 年马乌莱地震 Mw=8.8 相关地震活动分析及其对俯冲过程的影响

基本信息

  • 批准号:
    1045597
  • 负责人:
  • 金额:
    $ 16.83万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Continuing Grant
  • 财政年份:
    2011
  • 资助国家:
    美国
  • 起止时间:
    2011-02-15 至 2015-01-31
  • 项目状态:
    已结题

项目摘要

The Mw=8.8 Maule earthquake off the coast of Chile onFebruary 27, 2010 is the 5th largest megathrust earthquake ever to be recorded and the 2ndlargest to be recorded by modern digital seismic networks. Immediately following theMaule earthquake, teams of seismologists from Germany, France, the UK, and the US,working with seismologists in Chile, coordinated resources to deploy both broadband andshort period seismometers and accelerometers above the rupture zone to captureaftershocks associated with this significant earthquake. Data recorded from these stationswill be combined to produce an open international community data volume providing anunprecedented opportunity to investigate processes associated with great earthquakes andto image the anatomy of a subduction zone. A defining characteristic of the Maule aftershock investigationshas been collaboration, at both national and international levels. The original involvementin the data collection by US teams grew voluntarily out of the IRIS community, and therationale of greater efficiencies through cooperation was readily adapted by the fiveinternational groups working in the region.In this project the researchers will carry out a broad butinterrelated spectrum of seismic analyses to the Maule international seismic data set,along with a reanalysis of a selection of data collected in the rupture zone prior to theearthquake, to address some of the fundamental scientific objectives that motivated theinitial data collection. These objectives fall into two general categories: (1) ruptureprocesses of megathrusts, and (2) active tectonics and dynamics of an oceanic-continental(Andean) margin. They intend to produce an internally consistent set of data products across a range ofanalytical techniques. The PIs will share graduate students and scheduling extended visits to each others labs, thereby exposing students to a significantly broader range of experience than most students typically enjoy. Finally, they plan to engage our international colleagues by sharing some analysis tasks of mutualinterest. Data products generated by this study will be made available to the broaderinternational community via a dedicated web site.
MW = 8.8 Maule地震在2010年2月27日智利沿海地区是有史以来第五大巨像地震,也是现代数字地震网络记录的第二大地震。与智利的地震学家一起,与地震学家的团队紧随其后,与智利的地震学家合作,协调了资源,以在破裂区域上方部署宽带和肖特时期的地震仪和加速度计,以捕获与这一重大地震相关的捕获量。从这些站点记录的数据将结合起来,以产生开放的国际社会数据量,提供了不明显的机会,可以调查与大地震相关的过程,并为俯冲带的解剖结构形象化。国家和国际级别的Maule余震调查的定义特征是合作。在美国团队收集的数据收集中的最初参与是自愿从IRIS社区中发展出来的,并且在该地区工作的五境群体很容易通过合作提高效率。在该项目中,研究人员将在此项目中进行广泛的范围,但与Maule International Collectiul of Maule Seists Colulpult of Maule Seists Colultuers一起进行,并与Maules Collectiul consecult of a Maule Seists Colultuers一起进行了选择。 theearthquake,以解决动机数据收集的一些基本科学目标。这些目标分为两个一般类别:(1)大型巨像的破裂程序,以及(2)海洋 - 联合(Andean)边缘的主动构造和动力学。他们打算在一系列分析技术中生产一组内部一致的数据产品。 PI将分享研究生,并安排互相访问,从而使学生获得比大多数学生通常享受的更广泛的经验。最后,他们计划通过分享一些互动分析任务来吸引我们的国际同事。这项研究生成的数据产品将通过专门的网站向更广泛的社区提供。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Susan Beck其他文献

Enhancing Diversity of Nursing Faculty Using Distance Technology
  • DOI:
    10.1016/j.outlook.2010.02.156
  • 发表时间:
    2010-03-01
  • 期刊:
  • 影响因子:
  • 作者:
    Ginette A. Pepper;Susan Beck;Kathi Mooney;Lauren Clark;Mauren Keefe
  • 通讯作者:
    Mauren Keefe
A Critical Ethnography of Oncology Palliative Care Nurses in India: Exploring the Relationship Between Moral Distress and Cancer Pain Management (S765)
  • DOI:
    10.1016/j.jpainsymman.2013.12.183
  • 发表时间:
    2014-02-01
  • 期刊:
  • 影响因子:
  • 作者:
    Virginia Townsend Lebaron;Fraser Black;Susan Beck;Martha Maurer;Gayatri Palat
  • 通讯作者:
    Gayatri Palat
A double-blinded, randomized, controlled trial to quantitate photoprotective effects of an antioxidant combination product.
一项双盲、随机、对照试验,用于定量抗氧化剂组合产品的光保护作用。
Enhancing Diversity of Nursing Faculty Using Distance Technology
  • DOI:
    10.1016/j.outlook.2010.02.130
  • 发表时间:
    2010-03-01
  • 期刊:
  • 影响因子:
  • 作者:
    Ginette A. Pepper;Susan Beck;Kathi Mooney;Lauren Clark;Mauren Keefe
  • 通讯作者:
    Mauren Keefe

Susan Beck的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Susan Beck', 18)}}的其他基金

Collaborative Research: 3D Imaging of Controls on Subduction Zone Megathrust Rupture and Slip Behavior
合作研究:俯冲带巨型逆冲断裂和滑动行为控制的 3D 成像
  • 批准号:
    2321410
  • 财政年份:
    2023
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: TransANdean Great Orogeny (TANGO)
合作研究:跨安第斯大造山运动(TANGO)
  • 批准号:
    2020935
  • 财政年份:
    2020
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Continuing Grant
Collaborative Research: HIPER - 3D Onshore-Offshore Imaging of Controls on Subduction Zone Megathrust Rupture and Slip Behavior
合作研究:HIPER - 俯冲带巨型逆冲断裂和滑动行为控制的 3D 陆上-海上成像
  • 批准号:
    1951202
  • 财政年份:
    2020
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Continuing Grant
NNSFGEO-NERC: Collaboration: The Role OF Asperities and Slow Slip in Subduction Zone Rupture and Aftershock Sequences: Insights from the 16 April 2016 Pedernales Ecuador Earthquake
NNSFGEO-NERC:合作:凹凸带和慢滑移在俯冲带破裂和余震序列中的作用:2016 年 4 月 16 日厄瓜多尔佩德纳莱斯地震的见解
  • 批准号:
    1723065
  • 财政年份:
    2017
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: Subduction Dynamics, Mantle Structure, and Cenozoic Tectonic Evolution of South America
合作研究:南美洲俯冲动力学、地幔结构和新生代构造演化
  • 批准号:
    1565475
  • 财政年份:
    2016
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Variations Along a Continental Convergent Margin: Seismic imaging of the western margin of South America
沿大陆辐合边缘的变化:南美洲西缘的地震成像
  • 批准号:
    1415914
  • 财政年份:
    2014
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: Study of the Peruvian flat slab and its effects on the continental lithosphere
合作研究:秘鲁平板及其对大陆岩石圈影响的研究
  • 批准号:
    0943991
  • 财政年份:
    2010
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Continuing Grant
CAUGHT: Central Andean Uplift and the Geodynamics of High Topography
发现:安第斯中部隆起和高地形的地球动力学
  • 批准号:
    0907880
  • 财政年份:
    2009
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Continuing Grant
Upgrade of Computing Facilities for Global Seismology at the University of Arizona
亚利桑那大学全球地震学计算设施升级
  • 批准号:
    0651540
  • 财政年份:
    2007
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Lithospheric Structure and Deformation of the Flat Slab Region of Argentina
阿根廷平板区岩石圈结构与变形
  • 批准号:
    0510966
  • 财政年份:
    2005
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Continuing Grant

相似国自然基金

基于多算法组合协作的城市空中交通建模分析与优化管控研究
  • 批准号:
    72301278
  • 批准年份:
    2023
  • 资助金额:
    30.00 万元
  • 项目类别:
    青年科学基金项目
考虑工效学风险的人机协作生产线建模分析和任务分配研究
  • 批准号:
    72301166
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
面向实时视频分析的端云协作无服务器计算资源管理方法研究
  • 批准号:
    62302292
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
基于社会-行为-认知-情感的在线协作角色互动分析与干预研究
  • 批准号:
  • 批准年份:
    2022
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
双螺旋协作学习过程多模态分析与全息数字画像及精准干预研究
  • 批准号:
  • 批准年份:
    2022
  • 资助金额:
    54 万元
  • 项目类别:
    面上项目

相似海外基金

Collaborative Research: Data-Driven Elastic Shape Analysis with Topological Inconsistencies and Partial Matching Constraints
协作研究:具有拓扑不一致和部分匹配约束的数据驱动的弹性形状分析
  • 批准号:
    2402555
  • 财政年份:
    2024
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: Conference: Brazos Analysis Seminar
合作研究:会议:Brazos 分析研讨会
  • 批准号:
    2400111
  • 财政年份:
    2024
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: Conference: Brazos Analysis Seminar
合作研究:会议:Brazos 分析研讨会
  • 批准号:
    2400115
  • 财政年份:
    2024
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: Conference: Brazos Analysis Seminar
合作研究:会议:Brazos 分析研讨会
  • 批准号:
    2400112
  • 财政年份:
    2024
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
Collaborative Research: Investigating the Impact of Video-based Analysis of Classroom Teaching on STEM Teacher Preparation, Effectiveness, and Retention
合作研究:调查基于视频的课堂教学分析对 STEM 教师准备、有效性和保留率的影响
  • 批准号:
    2344795
  • 财政年份:
    2024
  • 资助金额:
    $ 16.83万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了