Collaborative Research: Rapid Response to the Mw 7.9 Earthquake of April 25, 2015 in Nepal

合作研究:对 2015 年 4 月 25 日尼泊尔 7.9 级地震的快速响应

基本信息

  • 批准号:
    1546611
  • 负责人:
  • 金额:
    $ 13.89万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2015
  • 资助国家:
    美国
  • 起止时间:
    2015-06-15 至 2018-05-31
  • 项目状态:
    已结题

项目摘要

This project is a rapid action to deploy a temporary seismological network following the Mw 7.9 earthquake of April 25, 2015 in Nepal. Data collected during the project will be made openly available to the seismological community one month after the array is uninstalled. This data collection impacts the Himalayan region known for its great seismological hazard. Aftershock deployment in the area of the 2015 earthquake will enable seismologists to conduct research, which will increase our understanding of the behavior of the Main Himalayan Thrust, a major underground fault responsible of this and other historical destructive earthquakes in the Himalayan region.In this project 25 seismic stations will be deployed in the greater epicentral region of the April 25, 2015 earthquake, and in western Nepal where a long-standing gap has accumulated about 10 m of deficit of slip since it last ruptured in 1505. These data will be useful in particular to determine a well-constrained source model of the 2015 earthquake, define the geometry of the Main Himalayan thrust, and analyze the relationship between post-seismic deformation and aftershocks. This deployment will be closely coordinated with another rapid deployment by US universities with 20 additional seismic stations that will increase the size of the monitoring network.
该项目是2015年4月25日尼泊尔发生7.9级地震后部署临时地震台网的一项快速行动。项目期间收集的数据将在阵列拆除一个月后公开提供给地震学界。这些数据收集影响了喜马拉雅地区以其巨大的地震危险而闻名。在2015年地震地区部署余震将使地震学家能够进行研究,这将增加我们对喜马拉雅主逆冲的行为的理解,这是一个主要的地下断层,造成了这次地震和喜马拉雅地区其他历史上的破坏性地震。在这个项目中,25个地震台站将部署在2015年4月25日地震的大震中地区,以及尼泊尔西部,那里有一个长期存在的裂缝,自1505年最后一次破裂以来,已经积累了大约10米的滑动赤字。这些数据将特别有助于确定2015年地震的良好约束震源模型,定义喜马拉雅主逆冲构造的几何形状,并分析震后变形与余震之间的关系。这一部署将与美国大学的另一项快速部署密切协调,该部署将增加20个地震台站,这将增加监测网络的规模。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

John Nabelek其他文献

John Nabelek的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('John Nabelek', 18)}}的其他基金

Collaborative Research: Investigating fault geometries and rupture processes in the Nepal Himalaya following the April 25, 2015 Gorkha earthquake
合作研究:调查 2015 年 4 月 25 日廓尔喀地震后尼泊尔喜马拉雅山的断层几何形状和破裂过程
  • 批准号:
    1620602
  • 财政年份:
    2016
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Continuing Grant
Collaborative Research: The Uplift and Seismic Structure of the Greater Caucasus
合作研究:大高加索地区的隆起和地震结构
  • 批准号:
    1620613
  • 财政年份:
    2016
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Continuing Grant
Seismicity, Structure and Dynamics of the Gorda Deformation Zone
戈尔达变形带的地震活动、结构和动力学
  • 批准号:
    1131767
  • 财政年份:
    2013
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Continuing Grant
Plate Boundary Evolution and Physics at an Oceanic Transform Fault System - The Blanco Transform OBS Experiment
海洋转换断层系统的板块边界演化和物理 - 布兰科转换 OBS 实验
  • 批准号:
    1031858
  • 财政年份:
    2012
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Continuing Grant
Crustal-Scale Geometry of Active Continental Normal Faults
活动大陆正断层的地壳尺度几何结构
  • 批准号:
    0952396
  • 财政年份:
    2010
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Continuing Grant
The Juan de Fuca Plate Laboratory: Comprehensive Investigation of Oceanic Ridge-Transform and Intraplate Seismicity from Regional Observations
胡安德富卡板块实验室:通过区域观测综合研究海洋脊变换和板内地震活动
  • 批准号:
    0752598
  • 财政年份:
    2008
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Collaborative Research: Lithosphere-Scale Dynamics of Active Mountain Building Along the H imalayan-Tibetan Collision Zone
合作研究:喜马拉雅-青藏高原碰撞带沿线活动造山的岩石圈尺度动力学
  • 批准号:
    9909609
  • 财政年份:
    2001
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Continuing Grant
Lithospheric-Scale Dynamics of Active Mountain Building Along the Himalayan-Tibetan Collision Zone
喜马拉雅-西藏碰撞带沿线活动造山的岩石圈尺度动力学
  • 批准号:
    9614776
  • 财政年份:
    1997
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Seismological and Regional Uplift Field Investigations Following the M=8.2 Irian Jaya, Indonesia Earthquake of February 17, 1996
1996 年 2 月 17 日印度尼西亚伊里安查亚 8.2 级地震后的地震学和区域隆起现场调查
  • 批准号:
    9633534
  • 财政年份:
    1996
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
A New Approach to Determining Long-Duration Slip of Large Earthquakes
确定大地震长历时滑移的新方法
  • 批准号:
    9526873
  • 财政年份:
    1996
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant

相似国自然基金

Research on Quantum Field Theory without a Lagrangian Description
  • 批准号:
    24ZR1403900
  • 批准年份:
    2024
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
Cell Research
  • 批准号:
    31224802
  • 批准年份:
    2012
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research
  • 批准号:
    31024804
  • 批准年份:
    2010
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research (细胞研究)
  • 批准号:
    30824808
  • 批准年份:
    2008
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Research on the Rapid Growth Mechanism of KDP Crystal
  • 批准号:
    10774081
  • 批准年份:
    2007
  • 资助金额:
    45.0 万元
  • 项目类别:
    面上项目

相似海外基金

Collaborative Research: Unlocking the evolutionary history of Schiedea (carnation family, Caryophyllaceae): rapid radiation of an endemic plant genus in the Hawaiian Islands
合作研究:解开石竹科(石竹科)石竹的进化史:夏威夷群岛特有植物属的快速辐射
  • 批准号:
    2426560
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
RAPID: Reimagining a collaborative future: engaging community with the Andrews Forest Research Program
RAPID:重新构想协作未来:让社区参与安德鲁斯森林研究计划
  • 批准号:
    2409274
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Collaborative Research: RAPID: A perfect storm: will the double-impact of 2023/24 El Nino drought and forest degradation induce a local tipping-point onset in the eastern Amazon?
合作研究:RAPID:一场完美风暴:2023/24厄尔尼诺干旱和森林退化的双重影响是否会导致亚马逊东部地区出现局部临界点?
  • 批准号:
    2403883
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
  • 批准号:
    2425431
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
  • 批准号:
    2427233
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
  • 批准号:
    2425430
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
  • 批准号:
    2427232
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
  • 批准号:
    2427231
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Collaborative Research: RAPID: A perfect storm: will the double-impact of 2023/24 El Nino drought and forest degradation induce a local tipping-point onset in the eastern Amazon?
合作研究:RAPID:一场完美风暴:2023/24厄尔尼诺干旱和森林退化的双重影响是否会导致亚马逊东部地区出现局部临界点?
  • 批准号:
    2403882
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
  • 批准号:
    2425429
  • 财政年份:
    2024
  • 资助金额:
    $ 13.89万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了