RAPID: Collaborative Research: Seismic Response to the 2016 M5.8 Pawnee Earthquake
RAPID:协作研究:2016 年 M5.8 波尼地震的地震响应
基本信息
- 批准号:1664286
- 负责人:
- 金额:$ 2.39万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:2016
- 资助国家:美国
- 起止时间:2016-11-01 至 2019-10-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
Induced earthquakes, or seismicity caused by human activity such as wastewater injection or secondary oil recovery, have been increasing in the midwestern United States since 2009. The state of Oklahoma has become known as "the new earthquake capital", with earthquake rates of M3 exceeding those of California in the last few years. The 3 September 2016 Mw5.8 Pawnee, Oklahoma earthquake occurred within the region of induced seismicity, near wastewater disposal wells, and was the largest earthquake ever recorded within the state. The earthquake occurred five years after the second largest earthquake, the similarly sized Mw5.7 November 2011 Prague earthquake. Near Pawnee, local residents reported strong ground-shaking, damage to houses, cracks on the ground, and concerns about safety. Students from Cornell University and Colombia University, in collaboration with local universities including the University of Oklahoma, Oklahoma State University, and University of Tulsa, actively participated in the rapid deployment of 25 seismic stations around the epicentral region. Students of the institutions involved have been actively involved in learning about sensors, network designs, and earthquake physics. The main fault the ruptured during the Pawnee event was an unmapped fault intersecting mapped Labette Fault, which has hosted a significant number of aftershocks include the largest aftershock (M3.9). The aftershock sequence and related seismic activity in the region that has been recorded since the rapid (within 2 days) deployment of seismic instrumentation will help study aftershocks and the likely triggered seismicity on the regional fault systems. In the coming weeks, we will deploy an additional 20 short-period stations that will record data for 12 months. This combined network will provide information on fault structure, aftershock decay, duration, and interaction with injection rate variations. The data will help to understand the characteristics of faults that host large damaging earthquakes, and will help to assess earthquake hazards in Oklahoma and the midcontinent. The broader impact of this rapid deployment will help understand the regional tectonic framework in northern Oklahoma and may elucidate the relationship between this recent seismic activity with the fluid injection activities in the region.
自2009年以来,美国中西部诱发地震,即由废水注入或二次采油等人类活动引起的地震活动不断增加。俄克拉荷马州已成为“新地震之都”,近几年M3级地震发生率超过了加利福尼亚州。 2016 年 9 月 3 日,俄克拉荷马州波尼 Mw5.8 地震发生在废水处理井附近的诱发地震活动区域内,是该州有记录以来最大的地震。这次地震发生在第二大地震(2011 年 11 月布拉格 Mw5.7 类似规模的地震)五年后。波尼附近,当地居民报告了强烈的地面震动、房屋受损、地面裂缝以及对安全的担忧。康奈尔大学、哥伦比亚大学的学生与俄克拉荷马大学、俄克拉荷马州立大学、塔尔萨大学等当地大学合作,积极参与震中地区周边25个地震台站的快速部署。相关机构的学生积极参与传感器、网络设计和地震物理学的学习。波尼事件期间破裂的主要断层是未绘制的断层,与绘制的拉贝特断层相交,该断层发生了大量余震,包括最大的余震 (M3.9)。自快速(2天内)部署地震仪器以来记录的该地区的余震序列和相关地震活动将有助于研究余震和区域断层系统上可能引发的地震活动。在接下来的几周内,我们将另外部署 20 个短期站,记录 12 个月的数据。该组合网络将提供有关断层结构、余震衰减、持续时间以及与注入率变化的相互作用的信息。这些数据将有助于了解发生大破坏性地震的断层的特征,并将有助于评估俄克拉荷马州和中部大陆的地震危害。这种快速部署的更广泛影响将有助于了解俄克拉荷马州北部的区域构造框架,并可能阐明最近的地震活动与该地区的流体注入活动之间的关系。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Kathleen Keranen其他文献
Kathleen Keranen的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Kathleen Keranen', 18)}}的其他基金
Collaborative Research: The context for rifting in East Africa - melt distribution and lithospheric removal imaged from axis to flank
合作研究:东非裂谷的背景 - 从轴到侧面成像的熔体分布和岩石圈去除
- 批准号:
1722987 - 财政年份:2018
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative research: Investigating effects of geologic complexity on induced seismicity, using M0-M5.7 seismicity from Prague, Oklahoma
合作研究:利用俄克拉荷马州布拉格的 M0-M5.7 地震活动研究地质复杂性对诱发地震活动的影响
- 批准号:
1649821 - 财政年份:2017
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
CAREER: Induced seismicity: Increasing understanding of fluids in fault zones and engaging stakeholders for rapid knowledge transfer
职业:诱发地震活动:增进对断层带流体的了解并让利益相关者参与快速知识转移
- 批准号:
1554846 - 财政年份:2016
- 资助金额:
$ 2.39万 - 项目类别:
Continuing Grant
Collaborative Research: Dynamics of caldera-scale rhyolitic magma systems
合作研究:破火山口规模流纹质岩浆系统的动力学
- 批准号:
1411542 - 财政年份:2014
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: The Aleutian megathrust from trench to base of the seismogenic zone; integration and synthesis of laboratory, geophysical, and geological data
合作研究:从海沟到地震带底部的阿留申巨型逆冲断层;
- 批准号:
1347262 - 财政年份:2014
- 资助金额:
$ 2.39万 - 项目类别:
Continuing Grant
Collaborative Research: Imaging plate boundary processes within the Cascadia subduction zone offshore central Washington with open-access marine seismic data
合作研究:利用开放获取的海洋地震数据对华盛顿中部近海卡斯卡迪亚俯冲带内的板块边界过程进行成像
- 批准号:
1333105 - 财政年份:2013
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: Exploring Extensional Tectonics Beyond the Ethiopian Rift
合作研究:探索埃塞俄比亚裂谷之外的伸展构造
- 批准号:
1440036 - 财政年份:2013
- 资助金额:
$ 2.39万 - 项目类别:
Continuing Grant
RAPID: Collaborative Research: A Short, Open-Access 2D MCS Acquisition Program off Washington State
RAPID:协作研究:华盛顿州附近的一个简短的、开放获取的 2D MCS 采集项目
- 批准号:
1147762 - 财政年份:2012
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Broadband Recording at the Site of Great Earthquake Rupture in the Alaska Megathrust
阿拉斯加巨型逆冲断层大地震破裂现场的宽带记录
- 批准号:
1132343 - 财政年份:2011
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: Exploring Extensional Tectonics Beyond the Ethiopian Rift
合作研究:探索埃塞俄比亚裂谷之外的伸展构造
- 批准号:
1118747 - 财政年份:2011
- 资助金额:
$ 2.39万 - 项目类别:
Continuing Grant
相似海外基金
Collaborative Research: Unlocking the evolutionary history of Schiedea (carnation family, Caryophyllaceae): rapid radiation of an endemic plant genus in the Hawaiian Islands
合作研究:解开石竹科(石竹科)石竹的进化史:夏威夷群岛特有植物属的快速辐射
- 批准号:
2426560 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
RAPID: Reimagining a collaborative future: engaging community with the Andrews Forest Research Program
RAPID:重新构想协作未来:让社区参与安德鲁斯森林研究计划
- 批准号:
2409274 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: A perfect storm: will the double-impact of 2023/24 El Nino drought and forest degradation induce a local tipping-point onset in the eastern Amazon?
合作研究:RAPID:一场完美风暴:2023/24厄尔尼诺干旱和森林退化的双重影响是否会导致亚马逊东部地区出现局部临界点?
- 批准号:
2403883 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425431 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427233 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425430 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427232 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
RAPID: Collaborative Research: Multifaceted Data Collection on the Aftermath of the March 26, 2024 Francis Scott Key Bridge Collapse in the DC-Maryland-Virginia Area
RAPID:协作研究:2024 年 3 月 26 日 DC-马里兰-弗吉尼亚地区 Francis Scott Key 大桥倒塌事故后果的多方面数据收集
- 批准号:
2427231 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: A perfect storm: will the double-impact of 2023/24 El Nino drought and forest degradation induce a local tipping-point onset in the eastern Amazon?
合作研究:RAPID:一场完美风暴:2023/24厄尔尼诺干旱和森林退化的双重影响是否会导致亚马逊东部地区出现局部临界点?
- 批准号:
2403882 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant
Collaborative Research: RAPID: Investigating the magnitude and timing of post-fire sediment transport in the Texas Panhandle
合作研究:RAPID:调查德克萨斯州狭长地带火灾后沉积物迁移的程度和时间
- 批准号:
2425429 - 财政年份:2024
- 资助金额:
$ 2.39万 - 项目类别:
Standard Grant














{{item.name}}会员




