课题基金 / 基金详情

Precision Measurement of the Muon Anomalous Magnetic Moment

Precision Measurement of the Muon Anomalous Magnetic Moment
μ子反常磁矩的精密测量
批准号:
1807266
负责人:
Tim Gorringe
金额:
$55.5万
依托单位国家:
美国
项目类别:
Continuing Grant
财政年份:
2018
资助国家:
美国
项目状态:
已结题
起止时间:
2018-09-01 至 2022-08-31

项目摘要

项目成果

Tim Gorringe的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This award supports continuing research activities to precisely measure characteristics of an elementary particle called the muon, which is similar to the electron but with larger mass. The experiment takes place at Fermi National Accelerator Facility (Fermilab) near Chicago, Illinois. Precise experimental tests of fundamental particle properties are now a well-established way to search for new laws of nature beyond our current physical knowledge. The measurement will address an intriguing discrepancy between a prior measurement and the Standard Model prediction of the muon?s characteristics and is sensitive to new particles and undetected forces that uniquely complement other efforts at high energy colliders and elsewhere. The PI will continue his involvement of high school students, physics majors, graduate students and post-doctoral researchers in research activities. The group's involvement in high-performance data acquisition, analysis and simulations will expose students to many aspects of innovative computer and telecommunications technology. The muon g-2 experiment will measure the muon anomalous magnetic moment to 140 ppb; a four-fold improvement over the prior BNL E821 experiment. The measurement will address the longstanding discrepancy of ~3.5 sigma between the previous BNL E821 measurement and the Standard Model prediction. It represents a key test of the Standard Model and has broad sensitivity to new particles and interactions beyond the Standard Model. It complements other searches for new physics at the energy, intensity and cosmic frontiers. The muon g-2 project has involved the relocation of the E821 muon storage ring from Brookhaven National Laboratory to Fermilab as well as major upgrades of the detector, electronics and acquisition sub-systems. The installation of the storage ring and its associated instrumentation on the Fermilab muon campus was completed in 2017. The first data taking run took place from November, 2017 to July, 2018 and has already exceeded the statistics of prior BNL E821. Two further majo running periods over the next three years should achieve the goals of collecting about 21 times the statistics of BNL E821. The PI's group has been, and continues to be, the lead for both the 20 GByte/sec, 100 TFlop, g-2 data readout and processing system and the infrastructure, analysis and simulation effort for the Q-method determination of the anomalous precession frequency. About one third of the group's overall effort will be associated with data acquisition responsibilities and two thirds of the overall effort associated with Q-method analysis responsibilities.This award reflects NSF's statutory mission and has been deemed worthy of support through evaluation using the Foundation's intellectual merit and broader impacts review criteria.
期刊论文(4)
专著(0)
科研奖励(0)
会议论文
DOI: 10.1103/physrevaccelbeams.24.044002
发表时间: 2021-04-27
期刊: PHYSICAL REVIEW ACCELERATORS AND BEAMS
影响因子: 1.7
作者: [Albahri, T., Anastasi, A., Wu, W.]
通讯作者: Wu, W.
Analysis and Operations for the Precision Measurement of the Muon Anomaly
Precision Muon Experiments
Low Energy, High Precision Muon Experiments
Studies of fundamental constants, interactions and symmetries via low-energy, high-precision muon experiments
国内基金
海外基金
Development of a Linear Stochastic Model for Wind Field Reconstruction from Limited Measurement Data
  • 批准号:
    --
  • 项目类别:
    --
  • 资助金额:
    40万元
  • 批准年份:
    2020
  • 负责人:
    Vikrant Gupta
  • 依托单位: