Rescue excavation and first safeguarding in the New-Kingdom-Necropolis in Aswan-West (Upper Egypt) in cooperation with the Eygtian Antiquities Organization; kick-off season to evaluate a long-term project in spring 2015

与埃及古物组织合作,对阿斯旺西部(上埃及)的新王国墓地进行抢救性挖掘和首次保护;

基本信息

项目摘要

The Egyptian Antiquities Organization offered the director of the Egyptian Museum Berlin (here: the applicant) the unusual and exclusive chance for a cooperation to investigate, to document, to record, to safeguard and to publish the new discovered decorated rock tombs of the New Kingdom (1550 - 1200 BC) in the region of Aswan-West. These tombs (7 are known till now and more than a dozen will be exspected) have been discovered and partly robbed by local plunderers in 2012. The newly discovered necropolis represents an archaeological and egyptological value of extreme significance, because the elite-tombs of the 18th dynasty were almost unknown up to now. The documentation of those tombs promises very important results in the field of art history, tomb architecture, material culture and funeral practices. Local features of the funeral custom should be compared with the previous versions of the Old and Middle Kingdom at the Qubbet el-Hawa as well as with the contemporary residential and local necropolis all over Egypt. The newly detected tomb owners and the other depicted and mentioned persons and officials will provide new important evidence in the field of prosopographical studies and in the structure and administrative organization of the local government on Elephantine Island and the 1st Upper Egyptian nome during the New Kingdom. The scientific capacity of the investigation of this necropolis cannot be estimated to its fully range and importance at the present state. Therefore a long term project should be applied for after the evaluation results of the kick-off season in spring 2015, which is the issue of the present proposal. Due to the fact that some of the 7 (until now known) tombs are accessible and are open to vandalism and looting and due to the fact that the Egyptian authorities are counting on the cooperation of the Egyptian Museum Berlin, a first season in spring 2015 will be more than necessary. The aims of the first season are the following: a) construction of protection walls above the tombs no. 4 & 5; b) documentation and epigraphic work in tomb no. 5; c) complete safeguarding of tomb no. 5 with walls and a solid roof; d) protection and covering the decorated façade of tomb no. 4 with sandbags; e) measurements of the area and the excavated tombs; f) photographic documentation of tomb no. 2 (User) for the publication by the Egyptian partners; g) conservation provisions in tomb no. 2 (User); h) evaluation of the further steps with regard to the application of a long term project, which should be submitted directly after the first season. (For all details see the attachments.)
埃及古物组织向柏林埃及博物馆馆长(此处:申请人)提供了一个不寻常的独家合作机会,以调查,记录,记录,保护和出版在阿斯旺西部地区新王国(公元前1550 - 1200年)新发现的装饰岩石坟墓。这些坟墓(目前已知的有7座,预计还会有十几座)是在2012年被当地的盗墓者发现并部分抢劫的。新发现的墓地具有极其重要的考古和埃及学价值,因为到目前为止,第18王朝的精英陵墓几乎是未知的。对这些墓葬的记录有望在艺术史、墓葬建筑、物质文化和丧葬习俗等领域取得非常重要的成果。葬礼习俗的地方特色应该与古王国和中王国在Qubbet el-Hawa的早期版本以及当代埃及各地的住宅和当地墓地进行比较。新发现的墓主和其他描绘和提到的人物和官员将在人物学研究领域、在新王国时期的象岛当地政府的结构和行政组织以及上埃及第一名方面提供新的重要证据。在目前的情况下,对这一墓地的调查的科学能力无法估计其全部范围和重要性。因此,在2015年春季开赛季评估结果出来后,需要申请一个长期项目,这也是本提案的问题所在。由于目前已知的7座古墓中有一些是可以进入的,很容易遭到破坏和抢劫,而且埃及当局正指望与柏林埃及博物馆合作,2015年春季的第一季将是不必要的。第一季的目标如下:a)在坟墓上方建造防护墙。4 & 5;B)第1号墓的文献和铭文作品;5;C)完整的坟墓保护;5有墙和坚固的屋顶;D)保护和覆盖墓室的装饰立面。4 .带沙袋;E)面积和出土墓葬的测量;F)编号墓的摄影记录。2(用户)为埃及合作伙伴的出版物;G)墓室养护规定;2(用户);H)评估关于长期项目申请的进一步步骤,该申请应在第一季后直接提交。(详情见附件)

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Professorin Dr. Friederike Seyfried其他文献

Professorin Dr. Friederike Seyfried的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Professorin Dr. Friederike Seyfried', 18)}}的其他基金

Digitalisierung von Papyri und Ostraka der Papyrussammlung Berlin, Bereitstellung einer Datenbank mit den Bildern im Internet.
将柏林纸莎草收藏中的纸莎草纸和陶片数字化,在互联网上提供包含图像的数据库。
  • 批准号:
    161646274
  • 财政年份:
    2010
  • 资助金额:
    --
  • 项目类别:
    Cataloguing and Digitisation (Scientific Library Services and Information Systems)
The Rock-Tombs of Qubbet el-Hawa North. A new Necropolis and its Impact on Upper Egypt and Lower Nubia
北库贝特哈瓦 (Qubbet el-Hawa) 的岩石坟墓。
  • 批准号:
    339666446
  • 财政年份:
  • 资助金额:
    --
  • 项目类别:
    Research Grants

相似海外基金

Improving excavation design through detailed characterization of the post-peak behaviour of veined rock
通过脉状岩石峰后行为的详细表征改进开挖设计
  • 批准号:
    580821-2022
  • 财政年份:
    2022
  • 资助金额:
    --
  • 项目类别:
    Alexander Graham Bell Canada Graduate Scholarships - Master's
Relationship between stress perturbation and seismicity induced by excavation of a huge cavity
巨大空洞开挖引起的应力扰动与地震活动的关系
  • 批准号:
    22H01331
  • 财政年份:
    2022
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Scientific Research (B)
Numerical Modelling Methods and Risk Mitigation for Underground Excavation Design in Rockbursting Conditions
岩爆条件下地下开挖设计的数值模拟方法和风险缓解
  • 批准号:
    570326-2022
  • 财政年份:
    2022
  • 资助金额:
    --
  • 项目类别:
    Alexander Graham Bell Canada Graduate Scholarships - Doctoral
Development of ground strength estimation method collaborating force and visual information during excavation to improve the efficiency of unmanned construction
开发挖掘过程中力与视觉信息协同的地基强度估算方法,提高无人施工效率
  • 批准号:
    22K04303
  • 财政年份:
    2022
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Digital Transformation (DX) of Excavation and Protection for Rescue Cultural Property Using XR Technology.
利用 XR 技术对抢救性文化财产进行挖掘和保护的数字化转型 (DX)。
  • 批准号:
    22K18252
  • 财政年份:
    2022
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Challenging Research (Pioneering)
Excavation of academic significance of stuffed endangered sea turtles scattered throughout the city
散落在全市的濒危海龟标本的发掘具有学术意义
  • 批准号:
    21K01003
  • 财政年份:
    2021
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Laboratory Investigation of Shear Behaviour of Rock Joints and the Influence of Fractures on Excavation Behaviour
岩石节理剪切行为及裂隙对开挖行为影响的室内研究
  • 批准号:
    535289-2019
  • 财政年份:
    2021
  • 资助金额:
    --
  • 项目类别:
    Alexander Graham Bell Canada Graduate Scholarships - Doctoral
Excavation of super-impossible objects and their mechanisms
超级不可能物体的挖掘及其机制
  • 批准号:
    21K19801
  • 财政年份:
    2021
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Challenging Research (Exploratory)
Advanced excavation damage zone behaviour prediction for immediate and delayed construction response during deep tunneling and deep geological repository development
深部隧道开挖和深层地质库开发期间即时和延迟施工响应的高级开挖损坏区域行为预测
  • 批准号:
    RGPIN-2016-04679
  • 财政年份:
    2021
  • 资助金额:
    --
  • 项目类别:
    Discovery Grants Program - Individual
Development of face stability theory considering progressive failure due to tunnel excavation
考虑隧道开挖引起的渐进破坏的工作面稳定性理论的发展
  • 批准号:
    21K14238
  • 财政年份:
    2021
  • 资助金额:
    --
  • 项目类别:
    Grant-in-Aid for Early-Career Scientists
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了