Study on the Recharge Mechanism and Development of Groundwater in the Inland area of Tanzania
坦桑尼亚内陆地区地下水补给机制及开发研究
基本信息
- 批准号:01041013
- 负责人:
- 金额:$ 13.76万
- 依托单位:
- 依托单位国家:日本
- 项目类别:Grant-in-Aid for international Scientific Research
- 财政年份:1989
- 资助国家:日本
- 起止时间:1989 至 1991
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
In the Makutapora Basin in central Tanzania, mean annual rainfall is about 600 mm while potential evaporation is 2470 mm. Thus groundwater recharge is highly dependent on the amount and pattern of rainfall. To understand the mechanism of groundwater recharge in the basin and surrounding area, a small watershed was selected and intensive hydrological observations were carried out. The relationship between actual evaporation and soil water content was derived from weighing lysimeter and the runoff ratio of representative sites were calculated from the measurement of infiltration capacity. Those results are combined to simulate water balance in the unsaturated zone and recharge is calculated to be 15 % of rainfall.Groundwater in the Makutapora Basin is divided into shallow groundwater and deep confined groundwater. The latter is then classified into type-1 and type-2 according to chloride ion concentration. The residence time of deep confined groundwater is generally more than 25 years, probably a few tens years, whereas the residence time of shallow groundwater is shorter than 20 years. P_<CO2>, tritium concentration and stable isotope composition also show that type-1 is the component from Chenene Hill area and type-2 is the component from the upper plane near the basin floor.
坦桑尼亚中部的马库塔波拉盆地年平均降雨量约为 600 毫米,潜在蒸发量为 2470 毫米。因此,地下水补给高度依赖于降雨量和降雨模式。为了了解流域及周边地区地下水的补给机制,选择了一个小流域,开展了密集的水文观测。通过称重蒸渗仪得出实际蒸发量与土壤含水量的关系,并通过入渗能力的测量计算出代表性站点的径流比。综合这些结果来模拟非饱和带的水平衡,计算补给量为降雨量的15%。Makutapora 盆地的地下水分为浅层地下水和深层承压地下水。后者根据氯离子浓度分为1型和2型。深层承压地下水的滞留时间一般在25年以上,可能几十年,而浅层地下水的滞留时间短于20年。 P_<CO2>、氚浓度和稳定同位素组成也表明,1型是来自Chenene Hill地区的组分,2型是来自盆底附近上平面的组分。
项目成果
期刊论文数量(10)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
SHIZUO SHINDO(ed.): SEIBUN-SHA. Study on the Recharge Mechanism and Development of Groundwater in the Inland area of Tanzania (Progress Report of Japan-Tanzania Joint Research (3)), 80 (1991)
进藤静夫(主编):SEIBUN-SHA。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
新藤 静夫(編): "Study on the recharge mechanism and development of groundwater in the inland area of Tanzania(Progress report of JapanーTanzania joint research(2))" 正文社 (平成元年度調査諸費にて印刷), 125 (1990)
Shizuo Shindo(编):《坦桑尼亚内陆地区地下水补给机制和开发研究(日本-坦桑尼亚共同研究进展报告(2))》《书文社》(1989年研究费印),125 (1990)
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
SHIZUO SHINDO(ed.): SEIBUN-SHA. Study on the Recharge Mechanism and Development of Groundwater in the Inland area of Tanzania (Progress Report of Japan-Tanzania Joint Research (4)), 95
进藤静夫(主编):SEIBUN-SHA。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
新藤 静夫(編): "Study on the recharge mechanism and development of groundwater in the inland area of Tanzania (Progress report of JapanーTanzania joint research (4))" 正文社, 95 (1992)
Shizuo Shindo(编):“坦桑尼亚内陆地区地下水补给机制和开发研究(日本-坦桑尼亚共同研究进展报告(4))”《书文社》,95(1992)
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
新藤 静夫(編): "Study on the recharge mechanism and development of groundwater in the inland area of Tanzania (Progress report of JapanーTanzania joint research (3))" 正文社, 80 (1991)
Shizuo Shindo(编):“坦桑尼亚内陆地区地下水补给机制和开发研究(日本-坦桑尼亚共同研究进展报告(3))”《书文社》,80(1991)
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
SHINDO Shizuo其他文献
SHINDO Shizuo的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('SHINDO Shizuo', 18)}}的其他基金
Huge Rainfall on Groundawter Quality in Arid Zone
暴雨对干旱区地下水质量的影响
- 批准号:
08041189 - 财政年份:1996
- 资助金额:
$ 13.76万 - 项目类别:
Grant-in-Aid for International Scientific Research.
Recharge, development and use of groundwater in U.A.E
阿联酋地下水的补给、开发和利用
- 批准号:
07041087 - 财政年份:1995
- 资助金额:
$ 13.76万 - 项目类别:
Grant-in-Aid for international Scientific Research
IMPROVEMENT OF DETECTION TECHNOLOGY FOR NAPLs POLLUTION IN GROUNDWATER
地下水NAPLs污染检测技术的改进
- 批准号:
05559002 - 财政年份:1993
- 资助金额:
$ 13.76万 - 项目类别:
Grant-in-Aid for Developmental Scientific Research (B)
Studies on the Hydro-Geomorphological Clasisfication and It's Quantification of Controlling Factors for Water Cycle in the Mountain Regions With Small Reliefs
小地形山地水文地貌分类及水循环控制因素量化研究
- 批准号:
01460266 - 财政年份:1989
- 资助金额:
$ 13.76万 - 项目类别:
Grant-in-Aid for General Scientific Research (B)
相似海外基金
RAPID: Managed Groundwater Recharge (MAR) in a year of exceptional precipitation: Evaluating the impact of dry-well versus on-farm recharge on water quality
RAPID:异常降水年份的地下水管理补给 (MAR):评估干井补给与农场补给对水质的影响
- 批准号:
2334880 - 财政年份:2023
- 资助金额:
$ 13.76万 - 项目类别:
Standard Grant
Groundwater Recharge within the Agricultural Landscape in a Changing Climate
气候变化下农业景观中的地下水补给
- 批准号:
RGPIN-2022-03674 - 财政年份:2022
- 资助金额:
$ 13.76万 - 项目类别:
Discovery Grants Program - Individual
RAPID: Quantifying timescales of groundwater recharge and discharge in seasonally snow-covered headwater catchments
RAPID:量化季节性积雪源头集水区地下水补给和排放的时间尺度
- 批准号:
2208424 - 财政年份:2022
- 资助金额:
$ 13.76万 - 项目类别:
Standard Grant
National groundwater recharge observing system
国家地下水补给观测系统
- 批准号:
LE220100125 - 财政年份:2022
- 资助金额:
$ 13.76万 - 项目类别:
Linkage Infrastructure, Equipment and Facilities
Tracing environmental forcing on groundwater recharge
追踪地下水补给的环境强迫
- 批准号:
RGPIN-2015-04966 - 财政年份:2019
- 资助金额:
$ 13.76万 - 项目类别:
Discovery Grants Program - Individual
Development of a Tool to Identify Groundwater Recharge Areas Vulnerable to Sodium Chloride Contamination in Well Head Protection Areas
开发工具来识别井口保护区易受氯化钠污染的地下水补给区
- 批准号:
543501-2019 - 财政年份:2019
- 资助金额:
$ 13.76万 - 项目类别:
Engage Grants Program
Land cover and topographic controls on groundwater recharge on the Oak Ridges Moraine
土地覆盖和地形对橡树岭冰碛地下水补给的控制
- 批准号:
RGPIN-2015-06116 - 财政年份:2019
- 资助金额:
$ 13.76万 - 项目类别:
Discovery Grants Program - Individual
Land cover and topographic controls on groundwater recharge on the Oak Ridges Moraine
土地覆盖和地形对橡树岭冰碛地下水补给的控制
- 批准号:
RGPIN-2015-06116 - 财政年份:2018
- 资助金额:
$ 13.76万 - 项目类别:
Discovery Grants Program - Individual
Groundwater Recharge in the Huancayo Region, Peru
秘鲁万卡约地区地下水补给
- 批准号:
526278-2018 - 财政年份:2018
- 资助金额:
$ 13.76万 - 项目类别:
University Undergraduate Student Research Awards
Tracing environmental forcing on groundwater recharge
追踪地下水补给的环境强迫
- 批准号:
RGPIN-2015-04966 - 财政年份:2018
- 资助金额:
$ 13.76万 - 项目类别:
Discovery Grants Program - Individual














{{item.name}}会员




