Study on field measurement of sand waves in a natural river
天然河流沙波现场测量研究
基本信息
- 批准号:06555149
- 负责人:
- 金额:$ 0.7万
- 依托单位:
- 依托单位国家:日本
- 项目类别:Grant-in-Aid for Scientific Research (A)
- 财政年份:1994
- 资助国家:日本
- 起止时间:1994 至 1996
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
There have been few field measurement of sand waves in a natural river during flood, due to lack of the measuring instrument. Therefore, the purpose of this study is to develop a filed measuring system for sand waves in natural rivers without man's operation. In this system, remote control boat with echo-sounder and total station which measures the position of boat are used. In order to develop this system, it is necessary to accumulate the measurements and verify their accuracy.During the first year, we had developed the remote control boat and taken the filed measurement in Sendai River during low water discharge. It is found that the bed level in a natural river can be measured with sufficient accuracy in this system during low velocity.In the following year, we have modified the remote control boat in order to conduct the measuring during high velocity such as flood and evaluated the accuracy of the measurement over the above period. Several problems in monitoring which occurred in this system during bad wether condition were investigated.This year as the last year of investigation, the influence of bed conditions such as sand diameter and bed slope, and noise reduction method from actual measurement have been studied. Finally, a total field meauring system was completed. However, we regret that we were not able to obtain the measurement during flood. Because there were no major flood this year so that we could not cover up all cases for application of measuring system.
由于测量仪器的缺乏,对天然河流汛期沙波的现场测量很少。因此,本研究的目的是开发一种无需人工操作的天然河流沙波现场测量系统。该系统采用遥控船、测深仪和全站仪来测量船的位置。为了开发该系统,有必要积累测量数据并验证其准确性。在第一年,我们研制了遥控船,并在仙台河低潮时进行了实地测量。结果表明,该系统在低速条件下能较好地测量天然河流的河床平面。在接下来的一年里,我们改进了遥控船,以便在洪水等高速期间进行测量,并评估了上述期间测量的准确性。对该系统在恶劣天气条件下监测中出现的几个问题进行了探讨。今年作为调查的最后一年,研究了沙粒直径、河床坡度等河床条件的影响,并从实际测量中研究了降噪方法。最后,完成了一个完整的现场测量系统。但是,很遗憾,我们无法在洪水期间获得测量结果。因为今年没有发生大的洪水,所以我们不能掩盖所有的情况来应用测量系统。
项目成果
期刊论文数量(10)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
Nagase, K: "Simulation of bed evolution around contraction in mountain river" Annual Journal of Hydraulic Engineering. 40. 887-892 (1996)
Nagase, K:“山区河流收缩周围河床演化的模拟”水利工程学年度杂志。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
永瀬恭一: "狭窄部を持つ山地河川の河床変動計算" 水工学論文集. 40. 887-892 (1996)
长濑恭一:“狭窄断面山区河流河床变化的计算”水利工程学报40. 887-892(1996)。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
鈴木幸一: "礫集合部の形成と破壊による混合砂礫河床の流砂量変動" 水工学論文集. 41. 801-806 (1997)
Koichi Suzuki:“由于砾石聚集体的形成和破坏而导致混合砾石河床中沉积物量的变化”水利工程学报 41. 801-806 (1997)。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
藤田正治: "千代川における淵の構造と魚類の生息環境" 水工学論文集. 40. 181-186 (1996)
Masaharu Fujita:“千代川的喙结构和鱼类栖息地”水利工程学报40。181-186(1996)。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
Suzuki, K.: "Bed Load Fluctuations of Gravel Mixture due to Formation and Destruction of Gravel Conentration" Annual Journal of Hydraulic Engineering. 41. 801-806 (1997)
Suzuki, K.:“由于砾石浓度的形成和破坏而引起的砾石混合物的床荷波动”水利工程年度杂志。
- DOI:
- 发表时间:
- 期刊:
- 影响因子:0
- 作者:
- 通讯作者:
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
MICHIUE Masanori其他文献
MICHIUE Masanori的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('MICHIUE Masanori', 18)}}的其他基金
Study on Formation of Huge Waves due to Landslide in a Reservoir
水库滑坡形成巨浪的研究
- 批准号:
10480095 - 财政年份:1998
- 资助金额:
$ 0.7万 - 项目类别:
Grant-in-Aid for Scientific Research (B).
Joint research on slope erosion and mass transport phenomena
坡面侵蚀与物质输送现象联合研究
- 批准号:
05044103 - 财政年份:1993
- 资助金额:
$ 0.7万 - 项目类别:
Grant-in-Aid for international Scientific Research
STUDY ON RIVER FACILITIES HARMONIOUS WITH ENVIRONMENT
河道设施与环境协调的研究
- 批准号:
03452213 - 财政年份:1991
- 资助金额:
$ 0.7万 - 项目类别:
Grant-in-Aid for General Scientific Research (B)
SIMULATION OF RIVER BED VARIATION BY MEANS OF FINITE ELEMENT METHOD
河床变化的有限元法模拟
- 批准号:
63550374 - 财政年份:1988
- 资助金额:
$ 0.7万 - 项目类别:
Grant-in-Aid for General Scientific Research (C)
相似海外基金
The orientation, shape, and stability of the Golden Gate sand waves
金门沙波的方向、形状和稳定性
- 批准号:
2130977 - 财政年份:2022
- 资助金额:
$ 0.7万 - 项目类别:
Standard Grant
Basic Research on Equivalent Sand-Grain Roughness of the Sand Waves of Small-Scale Having Three-Dimensional Configuration
三维结构小尺度砂波等效砂粒粗糙度的基础研究
- 批准号:
63550378 - 财政年份:1988
- 资助金额:
$ 0.7万 - 项目类别:
Grant-in-Aid for General Scientific Research (C)
Three-dimensional Measurement of Developing Sand Waves and Estimation of Wave Height.
发展中的沙波的三维测量和波高的估计。
- 批准号:
60550366 - 财政年份:1985
- 资助金额:
$ 0.7万 - 项目类别:
Grant-in-Aid for General Scientific Research (C)
Hydraulic Factors Controlling the Migration of Dunes and Sand Waves in a Tide-Dominated Environment
潮汐环境中控制沙丘和沙波迁移的水力因素
- 批准号:
7036077 - 财政年份:1970
- 资助金额:
$ 0.7万 - 项目类别:














{{item.name}}会员