课题基金 / 基金详情

Optimal yarding method for cable logging systems operated by small cable-yarders

Optimal yarding method for cable logging systems operated by small cable-yarders
小型电缆码放机操作的电缆测井系统的最佳码放方法
批准号:
10660136
负责人:
TASAKA Toshiaki
金额:
$1.22万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (C)
财政年份:
1998
资助国家:
日本
项目状态:
已结题
起止时间:
1998 至 2000

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
1. A mobile tower yarder, RME200T, RME300TC operated by running skyline system was set on different sits of experimental area in the Funyu training forest. On each setting the geometric variables and haul line pulling out time by chorker setters have been measured. The study showed that choker setters could reduce the force exerted by about 20 to 50% when using the carriage equipped with self line extraction mechanism.2. Method for estimating the productivity of a logging system using data-mining program C4.5 was discussed its possibilities and limitations in o the detailed planning of a logging operation in the Funyu training forest. The results obtained clarified that the highest productivity of cable logging was found in yarding with a clear-cut operation or a thinning operation with 2 operators over a 30% thinning rate and under a 78m yarding distance.3. Cable layout method for mobile tower yarder was studied in a clear-cut logging operation. A time-study analysis of mobile tower yarder was used to estimate the machine productivity and operating cost. Analysis indicates that optimizing method using neural network model can be used to improve productivity of tower yarder system. Further result suggest that system productivity of clear cut area is highest when operation site is constructed in small blocks, average 100 to 150m main line cable distance.4. Optimizing method for forest road density using machine power was made up and studied. In this process, result of a time-study analysis of tower yarder, cable yarder and forwarder were used to estimate machine productivity indices and construction cost of forest road. Analysis indicates that optimizing method using machine power can be effectively used to improve the forest road density. Further result suggest that forest road density is highest when using small size yarding machine, and it rapidly decrease after 20 to 100PS.
期刊论文(18)
专著(0)
科研奖励(0)
会议论文
田坂聡明,熊倉由典 ほか2: "ニューラルネットワーク手法による集材架線の適正配置法"森林利用学会誌. 15・3. 213-220 (2000)
Satoshi Tasaka、Yoshinori Kumakura 等 2:“使用神经网络方法的木材收集架空电线的适当放置方法”森林利用学会杂志 15・3(2000 年)。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
Tasaka, T., Kumakura, Y., Minematsu, H.and Sripraram, D.: "Optimizing cable line layout method for mobile tower yarder using neural network technology for classification"J.Jpn.For.Eng.Soc.. 15-3. 213-220 (2000)
Tasaka, T.、Kumakura, Y.、Minematsu, H. 和 Sripraram, D.:“利用分类神经网络技术优化移动塔式堆场机电缆线路布局方法”J.Jpn.For.Eng.Soc.. 15-
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
Sripraram D.Tasaka T: "The ability of a carriages developed for a mobil tower yarder"Journal of Forest Reserch. 4. 255-259 (1999)
Sripraram D.Tasaka T:“为移动塔式堆场机开发的车厢的能力”森林研究杂志。
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
Sripraram, D.and Tasaka, T.: "Analysis of dynamic parameters in running skyline cable logging system operated by a Japanese mobile tower yarder"Trans.Jpn.For.Soc.. 109. 445-448 (1998)
Sripraram, D. 和 Tasaka, T.:“日本移动塔式堆场机运行的天际线电缆测井系统动态参数分析”Trans.Jpn.For.Soc.. 109. 445-448 (1998)
DOI: --
发表时间:
期刊:
影响因子: --
作者: []
通讯作者:
17
    海外基金