Study on estimation for the destruction of the moraine dam for the risk assessment on the disaster that causes glacier lake outburst flood
Study on estimation for the destruction of the moraine dam for the risk assessment on the disaster that causes glacier lake outburst flood
批准号:
15360258
负责人:
UMEMURA Jun
金额:
$2.82万
依托单位:
依托单位国家:
日本
项目类别:
Grant-in-Aid for Scientific Research (B)
财政年份:
2003
资助国家:
日本
项目状态:
已结题
起止时间:
2003 至 2005
中文摘要
点击翻译按钮获取中文摘要
英文摘要
About the realities of the glacial lake outburst flood (GLOF) damage, the following results were obtained ;1)Starting of GLOF is a debris flow, and a large amount of debris is sedimented a few km down the moraine dam.2)Afterwards, the flow erode the bed of valley and down a long distance over several tens km while inducing the collapse of both sides intermittently.3)At the collapse slopes caused by GLOF, its vegetation is not recovered in 20 years or more. Due to so, these slopes have been eroded intermittently for a long term. Therefore, it is necessary to consider not only the case of generation of large-scale GLOF, but also a long series of measures of the recovery of this vegetation after it is generated.About the stability of the moraine dam, the following results were obtained ;1)At the front of moraine dam, the thick moraine sediment, 60m more thick, was measured by the seismic explorations. The results clearly show that the moraine dam was been steady because its sediment acts … More as the counter weight for slide of the ice body remaining into the moraine dam.2)It was found from the result that the melting of the ice body remaining the moraine dam is important for the estimating of the stability of the moraine dam. In addition, it is necessary to observe the surroundings, slopes and hanging glacier of the glacial lake (not only dam site) by the aero photograph. These are important points for evaluating the collapse risk.And, the temperatures into the moraine dam had never be 0℃ or less through the year. On the lake water, these of every depth of the lake also be 0℃ more in winter season. Therefore, the authors pointed that the simulation of melting of the ice body is needed for the risk evaluation of GLOF, because the condition of ice body has been progressing the melt now.Finally, the authors indicate the countermeasures ;1)Somebody says that the blasting of the moraine dam is most effective for reduce the GLOF. However, the authors do not concur with such kind of opinion. At first, the blasting of the ice body is difficult due to its scale. The moraine dam is also due to its composed loose. In addition, if GLOF is generated, the erosion of the slopes is caused for a long term.2)The subsidence of ice body has been progress too slowly. So, if we can control it, it will become the effective countermeasure for GLOF. Less
期刊论文(14)
专著(0)
科研奖励(0)
会议论文
登录
查看更多内容
梅村 順: "ネパール王国Imja氷河湖モレーンの物理・力学的性質"第38回地盤工学会研究発表会平成15年度講演概要集. 2181-2182 (2003)
Jun Umemura:“尼泊尔王国 Imja 冰川湖冰碛的物理和机械特性”第 38 届岩土工程学会研究报告 2003 年摘要 2181-2182 (2003)。
DOI:
--
发表时间:
期刊:
影响因子:
--
作者:
[]
通讯作者:
Region-wise distribution of water-induced hazards in relation to geo-historical development in Nepal
尼泊尔与地质历史发展相关的水灾害的区域分布
DOI:
--
发表时间:
2005
期刊:
Proceedings of Intl. S., Landslide Hazards in Orogenic Zone from the Himalaya to Island Arcs in Asia
影响因子:
--
作者:
[Higaki, D.]
通讯作者:
D.
DOI:
--
发表时间:
2004
期刊:
Abs.of Int.Conf."Environmental Hazards and Geomorphology in Monsoon Asia : Progress in Process Study and GIS Mapping"
影响因子:
--
作者:
[Umemura, J.]
通讯作者:
J.
Region-wize distribution of water-induced hazards in relation to geo-histrical development in Nepal
尼泊尔与地质历史发展相关的水灾害的区域分布
DOI:
--
发表时间:
2005
期刊:
Proceedings of Intl. S., Landslide Hazards in Orogenic Zone from the Himalaya to Island Arcs in Asia
影响因子:
--
作者:
[Higaki, D.]
通讯作者:
D.
氷河湖決壊洪水に対するハザードマップ作成の課題
创建冰湖溃决洪水灾害地图的问题
DOI:
--
发表时间:
2004
期刊:
月刊「測量」 Vol.55. No.10
影响因子:
--
作者:
[桧垣大助, 梅村 順]
通讯作者:
梅村 順
共 13 条
Study on the criterion of the seepage failure based on the flow velocity and applied it to the stability of a natural dams
-
批准号:22560499
-
项目类别:Grant-in-Aid for Scientific Research (C)
-
资助金额:$2.33万
-
财政年份:2010
-
负责人:UMEMURA Jun
-
依托单位: