Resilient timing for electricity distributed energy resource management
Resilient timing for electricity distributed energy resource management
批准号:
10006688
负责人:
金额:
$5.7万
依托单位:
依托单位国家:
英国
项目类别:
Collaborative R&D
财政年份:
2021
资助国家:
英国
项目状态:
已结题
起止时间:
2021 至 --
中文摘要
经济脱碳的快速行动,朝着实现政府净零排放2050年的目标,正在导致电网内部的一场革命。使用化石燃料的大规模集中式发电正在被高度分散的太阳能和风能等可再生资源发电所取代。这增加了电网管理的复杂性,因为有更多的发电机向电网供电。随着运输和供暖的电气化,电力需求预计将会增加。该项目将帮助Sygensys开发其创新的产品和服务,这些产品和服务需要有弹性的时间基准来衡量电网性能。我们的系统需要健壮,在设备故障、自然灾害或网络攻击等人为行为时提供可靠的操作。
英文摘要
The rapid move to decarbonize the economy, towards achieving governments Net Zero 2050 target, is leading to a revolution within the electricity grid. Large scale centralised generation, using fossil fuels, is being replaced by highly distributed generation from renewable resources including solar and wind. This increases the complexity of grid management with many more generators providing power to the grid. Electricity demand is forecast to increase as transport and heating is electrified.This project will help Sygensys develop its innovate products and services which need a resilient timing reference to measure electricity grid performance. Our system needs to be robust, providing reliable operation when subjected to equipment failure, natural disaster, or human action such as cyber-attack.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
基于Cache的远程计时攻击研究
-
批准号:60772082
-
项目类别:面上项目
-
资助金额:28.0万元
-
批准年份:2007
-
负责人:王韬
-
依托单位: