课题基金 / 基金详情

iWave Systems Ltd

iWave Systems Ltd
iWave系统有限公司
批准号:
10043690
负责人:
金额:
$6.24万
依托单位:
依托单位国家:
英国
项目类别:
Grant for R&D
财政年份:
2022
资助国家:
英国
项目状态:
已结题
起止时间:
2022 至 --
关键词:

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The wind renewables sector is a relatively new and rapidly growing industry which has at its heart a very up to date, clear and concise HSE culture from onshore operations all the way to the very demanding and sometimes remote offshore locations.Every aspect on a windfarms successful operation is born from the entire site and team adhering and constantly modifying all aspects of a safe work habit and environment. Which if not present or understood would results in a windfarm underperforming and losing revenue due to lost KPIs and down time. As we all know any serious HSE incident could result in a full investigation and potential impact on revenue and targets being missed.With this in mind the Sector is extremely clear on the rules and how they are applied and adhered to from lift operations through to correct documentation and procedures.After careful and continuous monitoring and study it became clear to iWave that there was a fundamental grey area within the essential process of disembarkment from the site CTVs to the WTGs by technicians.A site will have its procedures with regards to limits of transfer in marginal conditions. This maybe a set time and visual monitoring of the amount of movement the pushed on vessel moves which in turn will be interpretted by the vessel crew and technicians and a decision will hopefully be made as to whether it was safe to proceed.This practice has a few knock on results due to the human error and difference to an individuals perceptions in safe limits. Resulting in many times a team may transfer over limits or vice versa not transfer in conditions that are actually within limits. In either case the results can vary from a turbine that is down not getting fixed or a team is transfers in dangerous conditions in which case any incident could result in liability and HSE investigations.iWave have designed a system that will within a set time frame and set parameters on movement will deliver an easy to obey red light green light command. The systems parameters and time frames are all adjustable meaning a site can tailor its requirements and then the procedure will be signed off by all involved from shareholder (JOV) all the way down to technicians, this will eliminate any commercial pressure and set and industry standard giving absolute confidence to transferring teams.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
Graphon mean field games with partial observation and application to failure detection in distributed systems
  • 批准号:
  • 项目类别:
    省市级项目
  • 资助金额:
    --
  • 批准年份:
    2025
  • 负责人:
    MATHIEULOUROCHLAURIERE
  • 依托单位:
EstimatingLarge Demand Systems with MachineLearning Techniques
  • 批准号:
    --
  • 项目类别:
    外国学者研究基金
  • 资助金额:
    --
  • 批准年份:
    2024
  • 负责人:
    IoshuaAlex
  • 依托单位:
基于“阳化气、阴成形”理论探讨龟鹿二仙胶调控 HIF-1α/Systems Xc-通路抑制铁死亡治疗少弱精子症的作用机理
  • 批准号:
  • 项目类别:
    省市级项目
  • 资助金额:
    15.0万元
  • 批准年份:
    2024
  • 负责人:
    丁劲
  • 依托单位:
Understanding complicated gravitational physics by simple two-shell systems
  • 批准号:
    12005059
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    24.0万元
  • 批准年份:
    2020
  • 负责人:
    国分隆文
  • 依托单位: