WakeBlaster - faster than real-time wind farm flow simulation for optimised operational control
WakeBlaster - faster than real-time wind farm flow simulation for optimised operational control
批准号:
132381
负责人:
金额:
$17.58万
依托单位:
依托单位国家:
英国
项目类别:
Feasibility Studies
财政年份:
2016
资助国家:
英国
项目状态:
已结题
起止时间:
2016 至 --
中文摘要
点击翻译按钮获取中文摘要
英文摘要
Almost all offshore and most onshore wind turbines are sited in wind farms where curtailments and wakelosses can be quite substantial. This feasibility project explores the creation of a technology base that enablesoperators to increase the joint operational efficiency of wind turbines sited in wind farms. The envisagedWakeBlaster technology delivers cost effective, faster than real-time, yet accurate modelling of even very largewind farms. Control strategies based on WakeBlaster will lead to more efficient wind farms, reducing bothsocial cost and levelised cost of electricity.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
基于改进Faster R-CNN模型的新能源汽车时变非稳态噪声分离及预测方法研究
-
批准号:JCZRYB202501337
-
项目类别:省市级项目
-
资助金额:--
-
批准年份:2025
-
负责人:
-
依托单位: