课题基金 / 基金详情

Smarter and secure remote operation and automation of Heathrow’s private wire electricity distribution network

Smarter and secure remote operation and automation of Heathrow’s private wire electricity distribution network
希思罗机场专用有线配电网络更智能、更安全的远程操作和自动化
批准号:
61622
负责人:
金额:
$5.18万
依托单位国家:
英国
项目类别:
Feasibility Studies
财政年份:
2020
资助国家:
英国
项目状态:
已结题
起止时间:
2020 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
The project will comprise of a desktop study that will be carried out in the below four phases:**Phase 1: Analysis and review of Heathrow's existing remote operation technologies and processes**We will review and analyse the existing SCADA and remote operation systems at Heathrow Airport. We will identify under normal operating conditions how the technology is used for safe and secure operation, the processes involved, and the staff critical interactions with the systems. This will give a clear benchmark of what is normal practice at Heathrow Airport.**Phase 2: Identifying needs in constraint environment (COVID 19 etc.)**We will focus on the constraints that the COVID 19 situation is placing on the operation of Heathrow's network and the impact on critical staff for the operation of the network. The impact on normal maintenance operations will additionally be identified, and also consider scenarios where further impacts on staff could lead to detrimental impacts on operating the network at Heathrow.We will carry out this data gathering through telephone calls and video conferencing.**Phase 3: Innovative technology and market study -- review of commercially available solutions**The SCADA market has been continuously expanding and a number of suppliers are now offering remote applications for monitoring of programmable logic controllers (PLCs) and remote terminal unit (RTUs). More importantly, the desired solution should not only address the challenges identified in the COVID-19 environment but should also be useful in other restrictions for many years into the future.As part of this study, we would also focus on how the innovative solution could place Heathrow in a more resilient and competitive position. The options would include the following:1. Ability to operate the infrastructure with limited availability of control engineers2. Ability to carry out switching operations remotely or with the help from the control room3. Ability to switch off the electricity network to reduce losses and energy costsThe study would consider implementing the following technologies:1. The Internet of Things (IoT)2. Augmented Reality3. Virtual Reality4. Artificial Intelligence**Phase 4: Final Report**The final output of the study would be a comprehensive report that will recommend technologies, processes and tools which could be adopted at Heathrow along with a vision of what a smarter remote operation system might look for working through a pandemic situation such as being faced with COVID 19\.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
国内基金
海外基金
面向MANET的密钥管理关键技术研究
  • 批准号:
    61173188
  • 项目类别:
    面上项目
  • 资助金额:
    52.0万元
  • 批准年份:
    2011
  • 负责人:
    仲红
  • 依托单位:
混沌保密通信若干基础问题研究
  • 批准号:
    61073187
  • 项目类别:
    面上项目
  • 资助金额:
    11.0万元
  • 批准年份:
    2010
  • 负责人:
    朱从旭
  • 依托单位:
基于安全多方计算的抗强制电子选举协议研究
  • 批准号:
    60773114
  • 项目类别:
    面上项目
  • 资助金额:
    28.0万元
  • 批准年份:
    2007
  • 负责人:
    仲红
  • 依托单位: