StairFast Construction site stair safety system, using Digital/AR enhancement

StairFast 施工现场楼梯安全系统,采用数字/AR 增强功能

基本信息

  • 批准号:
    85796
  • 负责人:
  • 金额:
    $ 10万
  • 依托单位:
  • 依托单位国家:
    英国
  • 项目类别:
    Collaborative R&D
  • 财政年份:
    2020
  • 资助国家:
    英国
  • 起止时间:
    2020 至 无数据
  • 项目状态:
    已结题

项目摘要

Accurate Safety Ltd design and supplies best in class construction site safety edge protection, to prevent falls from height - the leading cause of deaths and injuries in construction, according to the Health and Safety Executive. Internal stairwells without balustrades pose a particular risk for contractors working on construction sites, in addition to the new social distancing requirements, which this innovation can help improve significantly.COVID-19 has reduced the turnover of Accurate Safety significantly, this grant would help us rapidly recover our sales position, by the launch of this innovative and commercially viable solution, we've called StairFast.We have a fabrication partner in China, which has created a prototype. However, Covid-19 has highlighted the vulnerability of this supply chain, since any future lockdown in China would threaten our ability to take StairFast to market. It has effectively stalled development.Bringing manufacturing back to the UK overcomes this threat, while also providing employment during a recession, which is a direct result of the Covid- 19 pandemic.**Current solutions**There are some edge protection systems for stairwells already on the market, however, they are typically made up of several different components and require scaffolding poles to be individually cut to size. This increases the risk of losing integral components. They also need to be drilled into the concrete slabs of the stairwell, which causes dust during installation, and requires the stairwell to be repaired before project completion.**StairFast**Therefore, in 2019 we began developing a new steel modular stairwell protection system, to solve issues with current products. StairFast was born and comprises of telescopic handrails, posts and secure fixing clamps, which are available in a range of sizes to suit different configurations.StairFast also incorporates HSE signage on the handrails, such as 'on-way' to promote social distancing protocols contained in the Construction Leadership Council's Covid-19 operating procedures.We also have plans as part of the project, to develop proprietary 3D modelling software accessible through an app, allowing site managers and quantity surveyors to calculate exact volumes of equipment required. This 'right equipment at the right time approach', reduces waste and costs, but also double handling of materials to decrease risk of Covid-19 transmission.**Summary*** Will help AS Ltd to rapidly grow with two company's supporting project* Quick and safe to install/dismantle, improving efficiency and productivity* Project team have 20 years combined experience in Edge Protection* Non-invasive fixing, avoids drill dust/repairs* Digital solution for exact quantities, reducing Landfill waste* Promotes Covid-19 social distancing protocols* Designed to be installed into Cross Laminated Timber, also important in helping reduce Carbon Emissions.
根据健康和安全主管的说法,准确的安全有限公司的设计和最佳供应在类建筑工地安全边缘保护方面最好,以防止高度下降 - 施工中死亡和伤害的主要原因。除了新的社会疏远要求外,内部楼梯间没有栏杆对在建筑工地工作的承包商构成了特殊的风险,这项创新可以大大改善。COVID-19大大降低了准确的安全性,这笔赠款还可以帮助我们快速恢复我们的销售位置,通过启动这种创新和商业上可行的解决方案,我们称其为刻板。但是,Covid-19强调了该供应链的脆弱性,因为中国的任何未来锁定都会威胁到我们将楼梯送往市场的能力。它有效地制造了开发。将制造业恢复到英国,克服了这一威胁,同时还可以在经济衰退期间提供就业,这是Covid-19 Pandemic的直接结果。这增加了失去整体组件的风险。还需要将它们钻入楼梯间的混凝土板中,这在安装过程中会导致灰尘,并需要在项目完成之前修复楼梯。 StairFast was born and comprises of telescopic handrails, posts and secure fixing clamps, which are available in a range of sizes to suit different configurations.StairFast also incorporates HSE signage on the handrails, such as 'on-way' to promote social distancing protocols contained in the Construction Leadership Council's Covid-19 operating procedures.We also have plans as part of the project, to develop proprietary 3D modelling software accessible through an应用程序,允许站点经理和数量测量师计算所需设备的精确量。这种“在正确的时间方法中的正确设备”减少了浪费和成本,还可以双重处理材料以降低Covid-19传播的风险。垃圾填埋场*促进COVID-19社会距离协议*旨在安装到交叉层压木材中,对于减少碳排放量也很重要。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

其他文献

Tetraspanins predict the prognosis and characterize the tumor immune microenvironment of glioblastoma.
  • DOI:
    10.1038/s41598-023-40425-w
  • 发表时间:
    2023-08-16
  • 期刊:
  • 影响因子:
    4.6
  • 作者:
  • 通讯作者:
Axotomy induces axonogenesis in hippocampal neurons through STAT3.
  • DOI:
    10.1038/cddis.2011.59
  • 发表时间:
    2011-06-23
  • 期刊:
  • 影响因子:
    9
  • 作者:
  • 通讯作者:

的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('', 18)}}的其他基金

An implantable biosensor microsystem for real-time measurement of circulating biomarkers
用于实时测量循环生物标志物的植入式生物传感器微系统
  • 批准号:
    2901954
  • 财政年份:
    2028
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Exploiting the polysaccharide breakdown capacity of the human gut microbiome to develop environmentally sustainable dishwashing solutions
利用人类肠道微生物群的多糖分解能力来开发环境可持续的洗碗解决方案
  • 批准号:
    2896097
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
A Robot that Swims Through Granular Materials
可以在颗粒材料中游动的机器人
  • 批准号:
    2780268
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Likelihood and impact of severe space weather events on the resilience of nuclear power and safeguards monitoring.
严重空间天气事件对核电和保障监督的恢复力的可能性和影响。
  • 批准号:
    2908918
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Proton, alpha and gamma irradiation assisted stress corrosion cracking: understanding the fuel-stainless steel interface
质子、α 和 γ 辐照辅助应力腐蚀开裂:了解燃料-不锈钢界面
  • 批准号:
    2908693
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Field Assisted Sintering of Nuclear Fuel Simulants
核燃料模拟物的现场辅助烧结
  • 批准号:
    2908917
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Assessment of new fatigue capable titanium alloys for aerospace applications
评估用于航空航天应用的新型抗疲劳钛合金
  • 批准号:
    2879438
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Developing a 3D printed skin model using a Dextran - Collagen hydrogel to analyse the cellular and epigenetic effects of interleukin-17 inhibitors in
使用右旋糖酐-胶原蛋白水凝胶开发 3D 打印皮肤模型,以分析白细胞介素 17 抑制剂的细胞和表观遗传效应
  • 批准号:
    2890513
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
CDT year 1 so TBC in Oct 2024
CDT 第 1 年,预计 2024 年 10 月
  • 批准号:
    2879865
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship
Understanding the interplay between the gut microbiome, behavior and urbanisation in wild birds
了解野生鸟类肠道微生物组、行为和城市化之间的相互作用
  • 批准号:
    2876993
  • 财政年份:
    2027
  • 资助金额:
    $ 10万
  • 项目类别:
    Studentship

相似国自然基金

智能建造“人机协作”场景下高龄建筑工人胜任力的影响机理与增强方法研究
  • 批准号:
    72301131
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
现场工业化建造的理论构建及其与装配式建造的协同路径研究
  • 批准号:
    72371050
  • 批准年份:
    2023
  • 资助金额:
    41.00 万元
  • 项目类别:
    面上项目
寒武纪大爆发极盛时期的微生物沉积建造
  • 批准号:
    42372023
  • 批准年份:
    2023
  • 资助金额:
    52 万元
  • 项目类别:
    面上项目
孪生数据驱动的船舶建造车间多工位协同优化与动态决策方法
  • 批准号:
    52371324
  • 批准年份:
    2023
  • 资助金额:
    50.00 万元
  • 项目类别:
    面上项目
均相液相生物芯片检测系统的构建及其在癌症早期诊断上的应用
  • 批准号:
    82372089
  • 批准年份:
    2023
  • 资助金额:
    48.00 万元
  • 项目类别:
    面上项目

相似海外基金

National Resource for Advanced NMR Technology
国家先进核磁共振技术资源
  • 批准号:
    10568406
  • 财政年份:
    2023
  • 资助金额:
    $ 10万
  • 项目类别:
Virtual Immersive Construction Site For Remote Experts (VICTOR)
远程专家虚拟沉浸式施工现场 (VICTOR)
  • 批准号:
    10041478
  • 财政年份:
    2023
  • 资助金额:
    $ 10万
  • 项目类别:
    Collaborative R&D
On-site measurement of worker exposure to respirable construction dust
现场测量工人接触可吸入建筑粉尘的情况
  • 批准号:
    10080478
  • 财政年份:
    2023
  • 资助金额:
    $ 10万
  • 项目类别:
    Collaborative R&D
REU Site: Smart and Sustainable Construction in the Digital Era
REU 网站:数字时代的智能和可持续建筑
  • 批准号:
    2244490
  • 财政年份:
    2023
  • 资助金额:
    $ 10万
  • 项目类别:
    Standard Grant
Targeting glycoprotein (G) domain-III for pan-lyssavirus nanobody therapeutics
靶向糖蛋白 (G) 结构域 III 用于泛狂犬病病毒纳米抗体治疗
  • 批准号:
    10667756
  • 财政年份:
    2023
  • 资助金额:
    $ 10万
  • 项目类别:
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了