课题基金 / 基金详情

Automated University Timetabling with Robustness

Automated University Timetabling with Robustness
稳健的自动化大学时间表
批准号:
2243326
负责人:
金额:
$0.0万
依托单位:
依托单位国家:
英国
项目类别:
Studentship
财政年份:
2019
资助国家:
英国
项目状态:
已结题
起止时间:
2019 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Timetabling and scheduling problems occur widely in both private and public sectors. (In)effectiveschedules can have a significant effect on profits and the efficient use of resources alongwith consumer and employee satisfaction.Alongside the effectiveness of a given timetable/schedule, the robustness/fragility ofa deployed solution when coping with changes in demand/resource availability is often also animportant concern.A prototypical timetabling problem is university course timetabling. With hundreds of rooms,hundreds of modules, hundreds of staff and thousands of students, the search domain is far toovast to be exhaustively enumerated to find an optimal solution satisfying the wide range ofconstraints needing to be satisfied. Instead, heuristic search algorithms are typically employed bya team of staff to develop the final timetable to be used.As a university grows in size, and the choice of modules available to a student both within andoutside their department expands, so the complexity the timetabling task also increases. Beyondthis, developing a timetable which has flexibility to cope with staff illness, and deal with variationin projected enrolments, complicates the task further.This project will develop and apply timetabling algorithms for the university timetabling domain,using e.g. hyper-heuristics, converting the constraints to be satisfied by a solution as criteria in amany-objective optimisation problem, and developing criteria to effectively assess the robustnessof a solution.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金