Capacity of pile foundations for railway over-line electrification equipment

Capacity of pile foundations for railway over-line electrification equipment
铁路跨线电气化设备桩基承载能力
批准号:
2614041
负责人:
金额:
$0.0万
依托单位:
依托单位国家:
英国
项目类别:
Studentship
财政年份:
2021
资助国家:
英国
项目状态:
未结题
起止时间:
2021 至 --

项目摘要

项目成果

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Up until the early 21st century, foundations for railway over-line electrification equipment (OLE) on UK railways were traditionally up to 5 m in length. However, design methods and structures introduced in connection with the Great Western Electrification Programme led to pile lengths up to roughly twice this. The reasons for this have been explored, and the applicability of the traditional empirical approach demonstrated with reference to a limited series of field tests, but considerable uncertainties and opportunity for further economy remain. The aim of this project is to explore factors influencing the capacity of pile foundations for railway OLE support masts, which may include the effects of an embankment or cutting slope on the lateral resistance; soil stiffness and the assessment of serviceability; the impacts of load cycling and gust loading; interactions between lateral, vertical and twist loading; and site characterisation issues. Investigative methods may include field testing, numerical and analytical modelling, and geotechnical centrifuge testing.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金