课题基金 / 基金详情

Integrated constraint-based planning and scheduling

Integrated constraint-based planning and scheduling
基于约束的集成规划和调度
批准号:
ARC : LP0219458
负责人:
Dr Aditya Ghose
金额:
$12.9万
依托单位:
依托单位国家:
澳大利亚
项目类别:
Linkage Projects
财政年份:
2002
资助国家:
澳大利亚
项目状态:
已结题
起止时间:
2002-01-01 至 2005-12-31

项目摘要

项目成果

Dr Aditya Ghose的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Integrated constraint-based planning and scheduling. Constraint programming is a relatively new technology based on artificial intellgence techniques that is becoming a popular tool for developing industrial optimisation solutions. While constraint programming has been used extensively for solving industrial scheduling problems, very little has been done in developing constraint-based integrated producting planning and scheduling systems. The size and complexity of typical production planning and scheduling problems requires the innovative use of the latest developments in constraint programming technology, together with a variety of other artificial intelligence techniques. This project seeks to develop and implement a new conceptual framework for integrated constraint-based planning and scheduling, using BHP Steel as a test - bed.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Practical methodologies for agent-oritented conceptual modelling
  • 批准号:
    ARC : LP0230453
  • 项目类别:
    Linkage Projects
  • 资助金额:
    $6.76万
  • 财政年份:
    2002
  • 负责人:
    Dr Aditya Ghose
  • 依托单位:
海外基金