课题基金 / 基金详情

Mining equipment reliability assessment models based on genetic algorithms and theoretical probability distributions

Mining equipment reliability assessment models based on genetic algorithms and theoretical probability distributions
基于遗传算法和理论概率分布的矿山设备可靠性评估模型
批准号:
155573-2008
负责人:
Vayenas, Nick
金额:
$1.31万
依托单位国家:
加拿大
项目类别:
Discovery Grants Program - Individual
财政年份:
2011
资助国家:
加拿大
项目状态:
已结题
起止时间:
2011-01-01 至 2012-12-31

项目摘要

项目成果

Vayenas, Nick的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
This proposal is a continuation of an NSERC grant which attempts to develop and test a mining equipment reliability assessment methodology based on Genetic Algorithms (GAs) with theoretical probability distributions as the fitness functions for the GAs models. GAs are stochastic search techniques based on the principles of natural selection, heredity and genetics. The reason for selecting GAs is the fact that the reliability of mining equipment changes over time due to its dependence upon several covariates/factors (e.g. the operating environment, quality of repair). These factors combine to create a complex impact on a piece of equipment's reliability function. This impact encapsulates and inherits to some degree the individual characteristics of the factors as they evolve over time. The overall idea is to investigate whether novel reliability assessment models based on GAs can produce satisfactory solutions compared to classical reliability analysis. So far, an Exponential distributions based GAs model and a Lognormal distributions based model have been developed and tested using collected data in the form of times between failures from underground mines. These two probability distributions have been found to fit historical failure data. However, the data indicated that the criteria of convergence does not suffice and it is imperative to develop models based on other probability distr. for achieving higher predictability. This proposal will first focus on the development and testing of new models and their comparison with the existing GAs models. Our previous research, on the combination of mine production simulation studies with GAs based reliability assessment models for analyzing the impact of mobile equipment failures on the productivity of mines, resulted in the development of a prototype mine simulator. The next phase in the development of this simulator will require the implementation of higher functionality to better represent real life mine case studies.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Mining equipment reliability assessment models based on genetic algorithms and theoretical probability distributions
  • 批准号:
    155573-2008
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.31万
  • 财政年份:
    2013
  • 负责人:
    Vayenas, Nick
  • 依托单位:
Mining equipment reliability assessment models based on genetic algorithms and theoretical probability distributions
  • 批准号:
    155573-2008
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.31万
  • 财政年份:
    2010
  • 负责人:
    Vayenas, Nick
  • 依托单位:
Mining equipment reliability assessment models based on genetic algorithms and theoretical probability distributions
  • 批准号:
    155573-2008
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.31万
  • 财政年份:
    2009
  • 负责人:
    Vayenas, Nick
  • 依托单位:
Mining equipment reliability assessment models based on genetic algorithms and theoretical probability distributions
  • 批准号:
    155573-2008
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $1.31万
  • 财政年份:
    2008
  • 负责人:
    Vayenas, Nick
  • 依托单位:
海外基金