课题基金 / 基金详情

Innovation mine optimization tailored to iron ore operations: long and short term planning with dynamic truck dispatching

Innovation mine optimization tailored to iron ore operations: long and short term planning with dynamic truck dispatching
针对铁矿石运营量身定制的创新矿山优化:通过动态卡车调度进行长期和短期规划
批准号:
500016-2016
负责人:
Kumral, Mustafa
金额:
$3.21万
依托单位:
依托单位国家:
加拿大
项目类别:
Collaborative Research and Development Grants
财政年份:
2016
资助国家:
加拿大
项目状态:
已结题
起止时间:
2016-01-01 至 2017-12-31

项目摘要

项目成果

Kumral, Mustafa的其他基金

相似基金

相关文献

中文摘要
翻译
点击翻译按钮获取中文摘要
英文摘要
Canada has approximately 6.3 billion tonnes crude iron ore reserves, which is ranked eighth in the world. The slump in iron ore concentrate (62% Fe) prices (from USD 187 per tonne in February 2011 to USD 45 per tonne at early 2016) led to cessations of some operations and suspensions of many development projects in Canada. Mining industry makes significant contribution to local communities and governments. As such, dramatic price decline may have profound societal effects. Only way to respond to this negative economic aura is to find innovative ways such that efficiency, performance, productivity, sustainability and/or profitability of an operation are ensured. This research proposes efficient mine planning and optimization approaches addressing to specific characteristics of open pit iron ore operations using cutting-edge operation research, decision making, machine learning and uncertainty management tools. First of all, a multi-variate analysis will be implemented to understand relationships among iron ore variables. A new ore - waste discrimination model will be developed in such a way as to maximize ore tonnage considering that some low grade material can be included in ore at a blending cost. This model will be used in long-term planning as an input. Throughout the parameterization, this ore - waste scheme should be updated continuously. A Lagrengian relaxation approach will be investigated to find appropriate multipliers such that annual productions are compatible with capacity requirements. Then, a short-term planning and bed-blending design will be optimized in connection to Krige's relationship. When short-term planning addresses grade requirements of processing design through a computationally efficient meta-heuristic, bed-blending design will minimize grade fluctuations of processing input material. The success of short-term planning, a certain extent, depends upon equipment management. In this scope, an efficient truck dispatching strategy will be explored. Finally, sensitivities and risks associated with data uncertainties will be further investigated. Thus, mining industry will have new planning tools that focuses on specific characteristics of iron ore.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Novel project and operations management strategies to adapt cyclical mineral industries to Industry 4.0 and the circular economy
  • 批准号:
    RGPIN-2019-04763
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2022
  • 负责人:
    Kumral, Mustafa
  • 依托单位:
Novel project and operations management strategies to adapt cyclical mineral industries to Industry 4.0 and the circular economy
  • 批准号:
    RGPIN-2019-04763
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2021
  • 负责人:
    Kumral, Mustafa
  • 依托单位:
Novel project and operations management strategies to adapt cyclical mineral industries to Industry 4.0 and the circular economy
  • 批准号:
    RGPIN-2019-04763
  • 项目类别:
    Discovery Grants Program - Individual
  • 资助金额:
    $2.26万
  • 财政年份:
    2020
  • 负责人:
    Kumral, Mustafa
  • 依托单位:
Design optimization of access roads and networks in hard-rock underground mines
  • 批准号:
    533528-2018
  • 项目类别:
    Collaborative Research and Development Grants
  • 资助金额:
    $4.95万
  • 财政年份:
    2020
  • 负责人:
    Kumral, Mustafa
  • 依托单位:
国内基金
海外基金
MinE蛋白构象激活机制的理论研究
  • 批准号:
    22373065
  • 项目类别:
    面上项目
  • 资助金额:
    50.00万元
  • 批准年份:
    2023
  • 负责人:
    高雅
  • 依托单位:
背景应力场差应力约束研究 -以Landers地震和Hecter Mine地震为例
基于MINE算法的大型底栖生物对溢油污染响应机制研究
  • 批准号:
    41606141
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    20.0万元
  • 批准年份:
    2016
  • 负责人:
    顾炎斌
  • 依托单位:
隧道超前探测的三分量光纤地震加速度检波机理与应用研究
  • 批准号:
    51079080
  • 项目类别:
    面上项目
  • 资助金额:
    32.0万元
  • 批准年份:
    2010
  • 负责人:
    蒋奇
  • 依托单位: