Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
基本信息
- 批准号:RGPIN-2016-05941
- 负责人:
- 金额:$ 1.75万
- 依托单位:
- 依托单位国家:加拿大
- 项目类别:Discovery Grants Program - Individual
- 财政年份:2020
- 资助国家:加拿大
- 起止时间:2020-01-01 至 2021-12-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
1. Introduction/Overview
This proposal aims to contribute towards the advancement of knowledge in the area of logistics, transportation and operations research with a purpose to disseminate this knowledge to both academics and practitioners. This research proposal will particularly focus on two important topics of supply chain management 1) vendor managed inventory problem and 2) two agents based scheduling problem. Vendor Managed Inventory (VMI) is one of the ways a supply chain can improve its performance by reducing cost and improving service. This is one of the successful business models used by Wal-Mart, Shell Chemicals and other retailers. The scheduling of jobs with two agents arises in many business areas such as telecommunications, integrated multimedia services, rail road tracks, manufacturing industry, maintenance planning etc.
2. Proposed Models:
I. VMI Infinite time horizon model: This model would assume that mean demand for each customer is known and constant. Most of the papers in literature consider the base cycle time to be a decision variable. However, practitioners prefer a convenient base cycle time such as one week, two weeks or a month for transportation planning purposes. Our model would assume a fixed base cycle time which will be specified by the manager.
II. VMI Finite time horizon model: This type of model minimizes the total inventory and transportation cost assuming a time dependent product demand. We will focus upon the single depot, multiple customers, time dependent demand and order-up-to-level replenishment policy model.
III. Two agents based scheduling problem with switch over time: The existing literature on two agents based scheduling model does not consider switch over time between different agents. A switchover time arises whenever a job of one agent is processed after a job of another agent. The concept of switchover time is similar to the setup time used in the literature of scheduling.
3. Proposed Methods:
We will develop heuristics and meta-heuristics based solution techniques for the integrated models. These solution techniques will be coded in C or C++ programming language and an experiment will be performed with benchmark problem instances.
4. Anticipated outcome of the program:
The proposed problem falls under category of NP-hard problems for which getting optimal solution is practically very difficult. The program will design solution methods for finding near optimal solution for the different models.
5. Training to take place through the proposal
One PhD student and three Master students will be recruited for this program. PhD and Master's students will be trained in developing mathematical and computer models for the problem.
6. Anticipated significance of the work:
The proposed research has the potential to improve supply chain operations by providing managers with a framework to minimize the production, transportation and inventory cost.
1. 介绍/概述
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Gajpal, Yuvraj其他文献
E-Learning during COVID-19 Outbreak: Cloud Computing Adoption in Indian Public Universities
- DOI:
10.32604/cmc.2021.014099 - 发表时间:
2021-01-01 - 期刊:
- 影响因子:3.1
- 作者:
Bhardwaj, Amit Kumar;Garg, Lalit;Gajpal, Yuvraj - 通讯作者:
Gajpal, Yuvraj
Optimization of Conventional and Green Vehicles Composition under Carbon Emission Cap
- DOI:
10.3390/su13126940 - 发表时间:
2021-06-01 - 期刊:
- 影响因子:3.9
- 作者:
Islam, Md Anisul;Gajpal, Yuvraj - 通讯作者:
Gajpal, Yuvraj
HEART: Unrelated parallel machines problem with precedence constraints for task scheduling in cloud computing using heuristic andmeta-heuristicalgorithms
- DOI:
10.1002/spe.2890 - 发表时间:
2020-09-07 - 期刊:
- 影响因子:3.5
- 作者:
Bhardwaj, Amit Kumar;Gajpal, Yuvraj;Gill, Sukhpal Singh - 通讯作者:
Gill, Sukhpal Singh
Enhanced heuristic for finance-based scheduling of construction projects
- DOI:
10.1080/01446193.2015.1063676 - 发表时间:
2015-07-03 - 期刊:
- 影响因子:3.4
- 作者:
Gajpal, Yuvraj;Elazouni, Ashraf - 通讯作者:
Elazouni, Ashraf
Vehicle routing problem in omni-channel retailing distribution systems
- DOI:
10.1016/j.ijpe.2017.11.011 - 发表时间:
2018-02-01 - 期刊:
- 影响因子:12
- 作者:
Abdulkader, M. M. S.;Gajpal, Yuvraj;ElMekkawy, Tarek Y. - 通讯作者:
ElMekkawy, Tarek Y.
Gajpal, Yuvraj的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Gajpal, Yuvraj', 18)}}的其他基金
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2021
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2019
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2018
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2017
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2016
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
相似海外基金
Project 2: Managed care updates of subscriber justice system involvement for suicide prevention
项目 2:订户司法系统参与预防自杀的管理式护理更新
- 批准号:
10688249 - 财政年份:2022
- 资助金额:
$ 1.75万 - 项目类别:
Project 2: Managed care updates of subscriber justice system involvement for suicide prevention
项目 2:订户司法系统参与自杀预防的管理护理更新
- 批准号:
10441874 - 财政年份:2022
- 资助金额:
$ 1.75万 - 项目类别:
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2021
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2019
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2018
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2017
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Algorithms for vendor managed inventory routing and machine scheduling models
供应商管理的库存路径和机器调度模型的算法
- 批准号:
RGPIN-2016-05941 - 财政年份:2016
- 资助金额:
$ 1.75万 - 项目类别:
Discovery Grants Program - Individual
Provision of Drug Abuse Treatment Services Under Parity
平等提供药物滥用治疗服务
- 批准号:
8601697 - 财政年份:2010
- 资助金额:
$ 1.75万 - 项目类别:
Provision of Drug Abuse Treatment Services Under Parity
平等提供药物滥用治疗服务
- 批准号:
8774996 - 财政年份:2010
- 资助金额:
$ 1.75万 - 项目类别:
Provision of Drug Abuse Treatment Services Under Parity
平等提供药物滥用治疗服务
- 批准号:
8212452 - 财政年份:2010
- 资助金额:
$ 1.75万 - 项目类别:














{{item.name}}会员




