交通可达性对青藏铁路沿线地区农牧户生计转型的影响机理研究
批准号:
42101207
项目类别:
青年科学基金项目(C类)
资助金额:
30.0 万元
负责人:
高兴川
依托单位:
学科分类:
城市地理和乡村地理
结题年份:
2024
批准年份:
2021
项目状态:
已结题
项目参与者:
高兴川
中文摘要
交通可达性是农牧地区生计转型的关键要素,研究交通可达性对农牧户生计转型的影响,探究作用路径与机理,对生态脆弱地区微观层面人地关系协调发展具有重要意义。本项目选择青藏铁路沿线地区为研究区,以“理论与方法构建—过程测度—影响机理—政策分析”为研究主线,在确定基于个人层面交通可达性表征方式、测度模型的基础上,聚焦于宏观交通发展对微观交通可达性时空变化规律、农牧户生计转型过程及特征,探究交通可达性在农牧户生计转型中的影响与作用,揭示微观层面交通可达性对生计转型的过程及机理,提出青藏高原交通发展与农牧家庭可持续发展的政策途径。通过本项目的研究,有利于丰富生态脆弱地区人地关系演进,特别是交通发展与农牧户生计转型的理论框架与研究体系,更有助于揭示高原地区交通发展的社会经济效应,为持续巩固与提升脱贫攻坚成果、实现农牧地区乡村振兴、高质量发展与高品质生活提供科学支撑与政策途径。
英文摘要
Transport accessibility is the key element of livelihood transition in agricultural and pastoral areas. It is of great significance to study the impact of transport accessibility on livelihood transition of farming and grazing households, and explore the path and mechanism of action for the coordinated development of human-land relationship at the micro level in ecologically fragile areas. The project selects the areas along the Qinghai-Tibet Railway as the research area, and takes "theory and method construction - process measurement - impact mechanism - policy analysis" as the main research line. On the basis of determining the representation mode and measurement model of transport accessibility based on individual level, the project focuses on the spatiotemporal variation law of macro traffic development on micro transport accessibility and the livelihood transition process and characteristics of farming and grazing households. Then, the project explores the impact and role of transport accessibility in the livelihood transition of farming and grazing households, reveals the process and mechanism of transport accessibility on the livelihood transition at the micro level, and puts forward policy approaches for the sustainable development of transportation development and farmers and herdsmen in the Qinghai-Tibet Plateau. The research of this project is conducive to enriching the evolution of human-land relationship in ecologically fragile areas, especially the theoretical framework and research system of transportation development and the livelihood transition of farming and grazing households. It is also helpful to reveal the socio-economic effects of transportation development in plateau areas, and is sustainable consolidate and improve the results of poverty alleviation, realize rural revitalization, high-quality development and high-quality life in agricultural and pastoral areas to provide scientific support and policy approaches.
本项目研究期限为2022-2024年,受疫情防控和依托单位变动影响,但总体上超额完成预期研究内容和考核指标。项目分为三个阶段:前期准备与基础理论研究、数据收集分析与实证研究、讨论交流与成果总结。至2024年12月31日,已完成学术论文5篇(其中1篇CSSCI、3篇SSCI、1篇SCI)、学术专著1部(拟于2025年出版),并培养硕士研究生1名。. 首先,青藏铁路建设显著提高了青藏高原的整体可达性水平,并对区域连通性产生积极影响,特别是跨省铁路段对外部区域可达性的促进作用。. 其次,定量评估了1982-2020年青藏高原乡镇尺度常住人口分布与生态系统服务价值之间的时空动态和协调性,为生态保护和区域发展政策提供新工具。. 随后,分析了青藏高原不同层级医疗设施可达性的空间演变及其影响因素,为构建均衡高效的医疗卫生体系提供科学依据。. 然后,研究了青藏高原交通基础设施空间效应,为交通基础设施建设与优化提供对策建议。. 最后,综合评估了不同交通模式下的日常通勤满意度和可达性,强调优化公共交通对减少私家车依赖、降低交通成本和环境压力的重要性。.本项目的研究结果支持交通基础设施建设对提升偏远地区区域可达性和经济发展的重要性,为理解交通项目对区域发展的长远影响提供科学工具,强调了对位于国家地理边缘区域的交通发展进行区域可达性分析的重要性。成果可为青藏高原乃至其他偏远地区的交通规划和政策制定提供依据,促进区域经济一体化,加强区域间的经济联系和合作。
服务效率视角下长三角城市群公共交通公平
性评价建模及应用
-
批准号:TGG24D010007
-
项目类别:省市级项目
-
资助金额:0.0万元
-
批准年份:2024
-
负责人:高兴川
-
依托单位:
国内基金
海外基金