本文介绍了一种新型组合剪力连接件的试验结果,该连接件可用于建造可拆组合楼板。共进行了21次推出试验,以量化不同设计参数的影响,包括不同的标称温度水平(20°C、100°C、300°C、450°C、600°C),钢桥面板垂直和平行于钢截面,两种不同的嵌入式剪力钉长度和两种不同等级的混凝土(C40/50和C20/25)。试验主要在稳态条件下进行,其中将试样温度升高至所需目标,然后施加载荷直至试样失效。还进行了一些瞬态试验,其中施加的载荷等于600 °C下稳态试验的承载能力,然后增加试样温度直至失效。观察到三种模式:(i)混凝土破碎与螺柱断裂,(ii)螺柱断裂和(iii)混凝土拔出。混凝土等级为C20/25的试件仅发生混凝土拔出。研究发现,在不超过400 °C的高温下,混凝土的破坏主要是由混凝土的破碎引起的,同时也产生了延性螺柱的破坏。在高于400 °C的高温下,失效模式变为剪切螺柱断裂。欧洲规范4的计算公式表明,产生的剪力连接件阻力与高等级混凝土的稳定状态结果合理一致,即使之前的公式是针对焊接剪力钉开发的。瞬态试验在低于目标温度600 °C的温度下失败,表明在高温下使用稳态试验评估剪力连接件的抵抗力可能不安全。
This paper presents the results of an experimental programme to investigate the performance of a new composite shear connector that can be used to build deconstructable composite floors. A total of21push-out tests were conducted to quantify the effects of different design parameters, including different nominal temperature levels (20°C, 100°C, 300°C, 450°C, 600°C), with the steel decking perpendicular and parallel to the steel section, two different embedded shear stud lengths and two different grades of concrete (C40/50and C20/25). The tests were mainly carried out under steady-state condition where the specimen temperatures were increased to the desired target and the load was then applied until failure of the specimen. A few transient tests were also carried out, in which a load equal to the load carrying capacity of the steady-state test at600°C was applied, followed by increasing the specimen temperature until failure. Three modes were observed: (i) concrete crushing with stud fracture, (ii) stud fracture and (iii) concrete pull-out. Concrete pull-out occurred only on one specimen with concrete gradeC20/25. It is found that the main failure mode at elevated temperatures not exceeding400°C was initiated by concrete crushing, concomitantly producing ductile stud damages. At elevated temperatures above400°C, the failure mode changed to shear stud fracture. The Eurocode 4 calculation equations were shown to produce shear connector resistances to be in reasonable agreement with the steady state results for the higher-grade concrete, even though the previous equations were developed for welded shear studs. The transient state tests failed at lower temperatures than the target temperature of600°C, indicating it may not be safe to use steady state tests for evaluation of shear connector resistance at high temperatures.