Air-cooled Magnetic Alloy Cavity for J-PARC Doubled Rep.-rate Scenario
Air-cooled Magnetic Alloy Cavity for J-PARC Doubled Rep.-rate Scenario
复制标题
DOI:
10.18429/jacow-ipac2014-thpri046
复制
发表时间:
2014-07
期刊:
影响因子:
--
通讯作者:
C. Ohmori;K. Hara;K. Hasegawa;M. Nomura;A. Schnase;T. Shimada;K. Takata;F. Tamura;M. Toda;Masanobu Yamamoto;M. Yoshii
中科院分区:
文献类型:
--
作者:
C. Ohmori;K. Hara;K. Hasegawa;M. Nomura;A. Schnase;T. Shimada;K. Takata;F. Tamura;M. Toda;Masanobu Yamamoto;M. Yoshii
TheupgradeprojectoftheJ-PARCMR(MainRing)based on doubled repetition-rate scenario is in progress to deliver the beam power of 750 kW. The present RF section will be occupied by 9 sets of new magnetic alloy, FT3L, cavities using the direct water cooling scheme. The direct water coolingistheefficientschemetocoolthemagneticalloycore although it requires dedicated high-quality cooling water whichdoesnotcontaincopperoxideandcopperionsbecause copper ions may cause the severe corrosion damage on the magnetic alloy cores. These cavities will be used for the fundamental RF for acceleration which requires high duty operation. The second harmonic RF is necessary to increase the bunch length. This allows to enlarge the beam current because it relaxes the space charge effects during the injection. Thanks to the high impedance FT3L and low duty operation of the second harmonic RF, the power loss in the second harmonic RF system becomes moderate. The air cooled cavity is designed to fit in any locations in the MR where the dedicated high-quality water is not available. This paper reports the design of the second RF system, technical issues to produce the magnetic alloy cores to fit the air cooling, and construction of the system.