COMMISSIONING OF ENERGY UPGRADED LINAC OF J-PARC
COMMISSIONING OF ENERGY UPGRADED LINAC OF J-PARC
复制标题
J-PARC 能量升级直线加速器调试
DOI:
--
复制
发表时间:
2014
期刊:
影响因子:
--
通讯作者:
K. Hasegawa
中科院分区:
文献类型:
--
作者:
K. Hasegawa
To realize a full potential of the J-PARC facility (1 MW at 3 GeV and 0.75 MW at 30 GeV), the J-PARC linac is upgraded from 181 MeV to 400 MeV by using an Annularring Coupled Structure linac (ACS). The ACS modules and peripheral system were installed and commissioned from summer of 2013. The results of beam commissioning and user operation are reported here.
DOI:
--
发表时间:
2014
期刊:
影响因子:
--
作者:
Miyake;Y.;H.Usui;H.Kojima;Hideki Seto
通讯作者:
Hideki Seto
DOI:
--
发表时间:
--
期刊:
影响因子:
--
作者:
通讯作者:
--