The Mathematic Model and Algorithm for the Co-Scheduling of the Three Gorges Dam and the Gezhouba Dam
The Mathematic Model and Algorithm for the Co-Scheduling of the Three Gorges Dam and the Gezhouba Dam
复制标题
DOI:
--
复制
发表时间:
2007
期刊:
影响因子:
--
通讯作者:
Feng Xiao-jian
中科院分区:
文献类型:
--
作者:
Feng Xiao-jian
Scheduling plan of the ship locks,coupled with bin packing problem,is a scheduling problem,which is a NP hard combinatorial optimization problem.The co-scheduling of the Three Gorges Dam and the Gezhouba dam takes comprehensive account of the double-line five-grade ship locks of the Three Gorges Dam(the ship lift hasn't been launched into operation now) and the three ship locks of the Gezhouba Dam,implements co-scheduling in light of the short distance between the two dams,so as to make the Golden Channel as expedite as possibly.According to the navigation constraints,the claims for security and scheduling principles of priority weights and preferential pass in the order of arrival,a mathematic model of co-scheduling is introduced in this paper,followed by the Progressive Optimality Algorithm for solution.The rationality of the model and the efficiency of the algorithm have been validated in the engineering application.