Next generation ATCA control infrastructure for the CMS Phase-2 upgrades
Next generation ATCA control infrastructure for the CMS Phase-2 upgrades
复制标题
用于 CMS 第 2 阶段升级的下一代 ATCA 控制基础设施
DOI:
--
复制
发表时间:
2018
期刊:
影响因子:
--
通讯作者:
W. H. Smith
中科院分区:
文献类型:
--
作者:
M. Vicente;T. Górski;A. Svetek;J. Tikalsky;R. Fobes;S. Dasu;W. H. Smith
A next generation control infrastructure to be used in Advanced TCA (ATCA) blades at CMS experiment is being designed and tested. Several ATCA systems are being prepared for the High-Luminosity LHC (HL-LHC) and will be installed at CMS during technical stops. The next generation control infrastructure will provide all the necessary hardware, firmware and software required in these systems, decreasing development time and increasing flexibility. The complete infrastructure includes an Intelligent Platform Management Controller (IPMC), a Module Management Controller (MMC) and an Embedded Linux Mezzanine (ELM) processing card.