Air Traffic Control Trajectory Based Operations
Air Traffic Control Trajectory Based Operations
批准号:
10109613
负责人:
金额:
$59.49万
依托单位:
依托单位国家:
英国
项目类别:
EU-Funded
财政年份:
2023
资助国家:
英国
项目状态:
未结题
起止时间:
2023 至 --
中文摘要
空中交通管制-基于轨迹的操作(ATC-TBO)项目旨在验证TBO SESAR解决方案,用于航路和TMA操作的战术执行阶段的飞行,从而有助于完成SESAR 2020中开发的SESAR阶段C以及SESAR阶段D中数字欧洲天空愿景的实现。预计这些成果将有助于提高产能、运营效率、安全、环境和成本效益。在项目开始和结束时具有TRL/EOCVM级别的SESAR解决方案是:·解决方案4:通过增强的轨迹预测和控制器工具改进扇区规划和分离管理的自动化,包括完成从SESAR 2020到V3的解决方案53 A(初始值= TRL 4/V2;目标值= TRL 6/ V3)通过横向和垂直复杂的CPDLC间隙改进了空中/地面轨迹同步,以支持TBO,包括完成从SESAR 2020到V3的解决方案56(初始值= TRL 4/V2;目标值= TRL 6/V3)先进的分离管理功能概念和工具,利用更可靠的轨迹信息和先进的数据链/CPDLC(初始值= TRL 1/2(V0/V1);目标值= TRL 4/V2)ATC TBO项目联合体-由EUROCONTROL作为项目协调员,由PMB和SJU指导-汇集了14个ANSP,1个空域用户,10个机载和地面行业合作伙伴,5个研究机构和1所大学。14个欧盟成员国、瑞士和英国派代表参加。该提案描述了21个验证练习,包括实时模拟,快速模拟和专家组。“设计”、“开发和验证”以及“数据包和成熟度”阶段计划于2023年下半年、2024年、2025年和2026年上半年进行。
英文摘要
The Air Traffic Control - Trajectory Based Operations (ATC-TBO) project proposes to validate TBO SESAR Solutions for flights in the tactical execution phase for en-route and TMA operations, thus contributing to the finalisation of the SESAR Phase C developed in SESAR 2020 and the realisation of the Digital European Sky vision in SESAR Phase D. The results are expected to contribute to capacity, operational efficiency, safety, environment and cost efficiency. The SESAR Solutions, with the TRL/EOCVM levels at the start and end of the project are: • Solution #4: Improved automation in sector planning and separation management via enhanced trajectory predictions and controller tools, including the completion of Solution 53A from SESAR 2020 to V3 (Initial = TRL4/V2; Target = TRL6/ V3) • Solution #5: Improved air/ground trajectory synchronisation via lateral and vertical complex CPDLC clearances to support TBO, including completion of Solution 56 from SESAR 2020 to V3 (Initial = TRL4/V2; Target = TRL6 /V3)• Solution #6: Advanced separation management function concepts and tools, making use of more reliable trajectory information and advanced use of datalink/CPDLC (Initial = TRL1/2 (V0/V1); Target = TRL4/V2) The ATC TBO project consortium - with EUROCONTROL as the project coordinator, and steering from the PMB and the SJU - brings together 14 ANSPs, 1 airspace user, 10 airborne and ground industry partners, 5 research establishments, and 1 university. 14 EU member states, Switzerland and the UK are represented. The proposal describes 21 validation exercises including real-time simulations, fast-time simulations, and expert groups. The 'design', 'development & validation', and 'data pack & maturity gate' phases are planned for the second half of 2023, 2024, 2025 and the first half of 2026.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
海外基金