Unrelated parallel machine scheduling problem with energy and tardiness cost
Unrelated parallel machine scheduling problem with energy and tardiness cost
复制标题
具有能源和迟到成本的不相关并行机调度问题
DOI:
10.1007/s00170-015-7657-2
复制
发表时间:
2015-08
影响因子:
3.4
通讯作者:
Guosheng Liu
中科院分区:
文献类型:
--
作者:
Zhantao Li;Haidong Yang;Shaqing Zhang;Guosheng Liu
With pervasive applications of new information technology, a larger number of manufacturing big data is generated. This paper considers the unrelated parallel scheduling problem within the background of “big data and cloud technology for manufacturing.” T
登录
查看更多内容
影响因子:
2.5
作者:
GAREY, MR;JOHNSON, DS
通讯作者:
JOHNSON, DS
DOI:
10.1109/tcad.2003.814245
发表时间:
2003-07
期刊:
IEEE Trans. Comput. Aided Des. Integr. Circuits Syst.
影响因子:
--
作者:
V. Swaminathan;K. Chakrabarty
通讯作者:
V. Swaminathan;K. Chakrabarty
DOI:
10.1115/1.4030510
发表时间:
2015
期刊:
Journal of Manufacturing Science and Engineering-Transaction of the ASME
影响因子:
--
作者:
Fei Tao(陶飞);L Zhang;Y Liu;Y Cheng;L Wang;X Xu
通讯作者:
X Xu
影响因子:
4.1
作者:
S. Kara;S. Manmek;C. Herrmann
通讯作者:
S. Kara;S. Manmek;C. Herrmann
DOI:
10.1007/3-540-44676-1_16
发表时间:
2001-08
期刊:
--
影响因子:
--
作者:
Eric Angel;E. Bampis;A. Kononov
通讯作者:
Eric Angel;E. Bampis;A. Kononov