Fisher—General Motors and the Nature of the Firm*
Fisher—General Motors and the Nature of the Firm*
复制标题
费舍尔——通用汽车和公司的性质*
DOI:
10.1086/467449
复制
发表时间:
2000
期刊:
影响因子:
--
通讯作者:
B. Klein
中科院分区:
文献类型:
--
作者:
B. Klein
After working well for more than 5 years, the Fisher Body—General Motors (GM) contract for the supply of automobile bodies broke down when GM's demand for Fisher's bodies unexpectedly increased dramatically. This pushed the imperfect contractual arrangement between the parties outside the self‐enforcing range and led Fisher to take advantage of the fact that GM was contractually obligated to purchase bodies on a cost‐plus basis. Fisher increased its short‐term profit by failing to make the investments required by GM in a plant located near GM production facilities in Flint, Michigan. Vertical integration, with an associated side payment from GM to Fisher, was the way in which this contractual hold‐up problem was solved. This examination of the Fisher‐GM case illustrates the role of vertical integration in avoiding the rigidity costs of long‐term contracts.
影响因子:
2.2
作者:
M. Sako;S. Helper
通讯作者:
M. Sako;S. Helper