Single-machine bicriterion group scheduling with deteriorating setup times and job processing times
Single-machine bicriterion group scheduling with deteriorating setup times and job processing times
复制标题
设置时间和作业处理时间恶化的单机双标准组调度
DOI:
10.1016/j.amc.2014.05.048
复制
发表时间:
2014-09
影响因子:
4
通讯作者:
Liu Yajing
中科院分区:
文献类型:
--
作者:
Wang Jianjun;Liu Yajing
This paper considers a group scheduling problem with two ordered criteria where both setup times and job-processing times are increasing functions of their starting times. It is assumed that the jobs be classified into several groups and the jobs of the same group have to be processed contiguously. We consider two objectives where the primary criterion is the total weighted completion time and the secondary criterion is the maximum cost. A polynomial time algorithm is presented to solve this bicriterion group scheduling problem with deteriorating setup times and job-processing times. This algorithm can also solve single-machine group scheduling problems with deteriorating setup times and job-processing times in several ordered maximum cost and arbitrary precedence.
登录
查看更多内容
DOI:
10.1007/s00170-011-3639-1
发表时间:
2011-10
影响因子:
3.4
作者:
Wang, Ji-Bo;Huang, Xue;Wu, Yu-Bin;Ji, Ping
通讯作者:
Ji, Ping
影响因子:
--
作者:
K.R Baker
通讯作者:
K.R Baker
影响因子:
5
作者:
Caimin Wei;Ji-Bo Wang
通讯作者:
Caimin Wei;Ji-Bo Wang
DOI:
10.1007/s00170-008-1667-2
发表时间:
2009-07
期刊:
The International Journal of Advanced Manufacturing Technology
影响因子:
--
作者:
Ji-Bo Wang;Wen-Jun Gao;Li-Yan Wang;Dan Wang
通讯作者:
Ji-Bo Wang;Wen-Jun Gao;Li-Yan Wang;Dan Wang
影响因子:
7.9
作者:
M. Ozden;P. Egbelu;Ananth V. Iyer
通讯作者:
M. Ozden;P. Egbelu;Ananth V. Iyer