No-wait two-machine permutation flow shop scheduling problem with learning effect, common due date and controllable job processing times

No-wait two-machine permutation flow shop scheduling problem with learning effect, common due date and controllable job processing times
复制标题

具有学习效果、共同到期日、作业处理时间可控的无等待两机排列流水车间调度问题

DOI:
10.1080/00207543.2017.1371353
复制
发表时间:
2018-03
影响因子:
9.2
通讯作者:
Yuan-Yuan Lu
Yuan-Yuan Lu
中科院分区:
工程技术2区
文献类型:
--
作者:
Fu Gao;Mengqi Liu;Jian-Jun Wang;Yuan-Yuan Lu

文献摘要

参考文献

被引文献

相似文献

摘要我们考虑两台机器无等待置换流水作业共同交货期分配调度问题,其中工件的处理时间是其在序列中的位置及其分配给该工件的资源量的函数。的
Abstract We consider a two-machine no-wait permutation flow shop common due date assignment scheduling problem where the processing time of a job is given as a function of its position in the sequence and its amount of resource allocated to this job. The
具有资源分配和学习效果的单机分组调度
DOI: 10.1016/j.cie.2010.10.012
发表时间: 2011-02
期刊: Comput. Ind. Eng.
影响因子: --
作者:
通讯作者: --
DOI: --
发表时间: 1992
期刊: --
影响因子: --
作者:
R. Barnett
通讯作者: R. Barnett
DOI: 10.1142/s0217595915500268
发表时间: 2015-07
期刊: Asia Pac. J. Oper. Res.
影响因子: --
作者:
Yuan-Yuan Lu-Yuan;Fei Teng;Zhi-Xin Feng
通讯作者: Yuan-Yuan Lu-Yuan;Fei Teng;Zhi-Xin Feng
以可控的处理时间、截断的依赖于工作的学习和退化效应来安排工作
DOI: 10.3934/jimo.2016060
发表时间: 2016-10
影响因子: 1.3
作者:
Ji-Bo Wang;Mengqi Liu;Na Yin;Ping Ji
通讯作者: Ping Ji
联合多任务调度和常见到期日分配问题的算法
DOI: 10.1080/00207543.2017.1321804
发表时间: 2017
影响因子: 9.2
作者:
Ming Liu;Shijin Wang;Feifeng Zheng;Chengbin Chu
通讯作者: Chengbin Chu