高度的进度遵从性非常重要,但在按订单生产中很少实现。特别是当命令发布得太晚时(e)。G.由于缺少原材料),确定还有多少订单可以及时生产是具有挑战性的。本文展示了企业如何识别其潜力,以提高最早的操作到期日排序的时间表遵守。简单的模型表明,五个参数确定的潜力,以增加时间表的遵守,通过排序:输入序列偏差,可调水平,操作的数量,计划顺序互换的订单吞吐量,和并行机的数量。
High schedule compliance is very important but rarely achieved in make-to-order productions. Especially when orders are released too late (e. g. due to missing raw material) it is challenging to identify how many orders can still be produced in time. This paper shows how companies can identify their potential to increase schedule compliance by earliest operation due-date sequencing. The simple model shows that five parameters determine the potential to increase schedule compliance through sequencing: the input sequence deviation, the WIP level, the number of operations, planned sequence interchanges in the order throughput, and the number of parallel machines.
建模迟到和进度可靠性:公司如何按时生产
DOI: 10.1080/09537287.2012.655803
发表时间: 2012
影响因子: 8.3
作者:
Lödding;Nyhuis;Schmidt;Kuyumcu
通讯作者: Kuyumcu
DOI: 10.15480/882.1126
发表时间: 2013
影响因子: 9.2
作者:
Arif Kuyumcu
通讯作者: Arif Kuyumcu
DOI: --
发表时间: 2016
期刊:
影响因子: --
作者:
J. Mayer;P. Nyhuis;Julian Pielmeier;C. Berger;T. Hempel;Philipp Hünnekes;Frederika Engehausen
通讯作者: Frederika Engehausen