Describing the influence of set-up optimised sequencing on output lateness of workstations

Describing the influence of set-up optimised sequencing on output lateness of workstations
复制标题

描述设置优化排序对工作站输出延迟的影响

DOI:
10.1080/09537287.2017.1314038
复制
发表时间:
2017
影响因子:
8.3
通讯作者:
Nyhuis
Nyhuis
中科院分区:
管理学3区
文献类型:
--
作者:
Nyhuis

文献摘要

参考文献

被引文献

相似文献

Productivity and schedule reliability are two key objectives when designing, planning and controlling an enterprise’s internal supply chain. Productivity can be increased by implementing set-up optimised order sequencing, which reduces the time and costs required for set-ups. However, since planned end-of-order-processing dates are ignored with set-up optimised sequencing, it tends to cause increased lateness and thus poorer schedule reliability. Accordingly, enterprises must weigh the highest possible productivity against a high schedule reliability. In this paper, we develop a logistic model that can be used by enterprises to facilitate describing the impact of set-up optimised sequencing on a workstation’s lateness behaviour. This logistic model depicts the extent of the output lateness’ standard deviation as a function of the mean WIP, mean workstation output and the input lateness’ standard deviation when applying set-up optimised sequencing. It is thus possible to quantitatively describe the effects of set-up optimised sequencing on the logistic objective ‘schedule reliability’ and compare possible productivity gains.
建模迟到和进度可靠性:公司如何按时生产
DOI: 10.1080/09537287.2012.655803
发表时间: 2012
影响因子: 8.3
作者:
Lödding;Nyhuis;Schmidt;Kuyumcu
通讯作者: Kuyumcu
DOI: 10.1016/j.ijpe.2003.07.003
发表时间: 2004-09
影响因子: 12
作者:
B. Lin;A. Jeng
通讯作者: B. Lin;A. Jeng
订单发布和与顺序相关的设置时间
DOI: --
发表时间: 1997
期刊:
影响因子: --
作者:
H. Missbauer
通讯作者: H. Missbauer
多机作业车间中交货期设置的计算机模拟
DOI: --
发表时间: 2001
期刊:
影响因子: --
作者:
Emre A. Veral
通讯作者: Emre A. Veral
进度合规操作曲线及其在金属生产商供应链设计中的应用
DOI: 10.1080/09537287.2013.782947
发表时间: 2013
影响因子: 8.3
作者:
Schmidt;Bertsch;Nyhuis
通讯作者: Nyhuis