Describing the influence of set-up optimised sequencing on output lateness of workstations
Describing the influence of set-up optimised sequencing on output lateness of workstations
复制标题
描述设置优化排序对工作站输出延迟的影响
DOI:
10.1080/09537287.2017.1314038
复制
发表时间:
2017
影响因子:
8.3
通讯作者:
Nyhuis
中科院分区:
文献类型:
--
作者:
Nyhuis
Productivity and schedule reliability are two key objectives when designing, planning and controlling an enterprise’s internal supply chain. Productivity can be increased by implementing set-up optimised order sequencing, which reduces the time and costs required for set-ups. However, since planned end-of-order-processing dates are ignored with set-up optimised sequencing, it tends to cause increased lateness and thus poorer schedule reliability. Accordingly, enterprises must weigh the highest possible productivity against a high schedule reliability. In this paper, we develop a logistic model that can be used by enterprises to facilitate describing the impact of set-up optimised sequencing on a workstation’s lateness behaviour. This logistic model depicts the extent of the output lateness’ standard deviation as a function of the mean WIP, mean workstation output and the input lateness’ standard deviation when applying set-up optimised sequencing. It is thus possible to quantitatively describe the effects of set-up optimised sequencing on the logistic objective ‘schedule reliability’ and compare possible productivity gains.
登录
查看更多内容
影响因子:
8.3
作者:
Lödding;Nyhuis;Schmidt;Kuyumcu
通讯作者:
Kuyumcu
影响因子:
12
作者:
B. Lin;A. Jeng
通讯作者:
B. Lin;A. Jeng
DOI:
--
发表时间:
1997
期刊:
影响因子:
--
作者:
H. Missbauer
通讯作者:
H. Missbauer
DOI:
--
发表时间:
2001
期刊:
影响因子:
--
作者:
Emre A. Veral
通讯作者:
Emre A. Veral
影响因子:
8.3
作者:
Schmidt;Bertsch;Nyhuis
通讯作者:
Nyhuis