英文摘要
Network scheduling techniques--such as the arrow diagramming Critical Path Method (CPM), Precedence Diagramming CPM, and the Performance Evaluation and Review Technique (PERT)--were developed extensively for the defense industry for control of their large government contracts. These methods have gradually been adopted by a segment of the construction industry, but they do not fulfill the criteria which a good scheduling system should meet. The objectives of this research include the development of a modeling approach that depicts the hard logic and alternative logic for project activities and the development of optimization functions for the scheduling model to minimize project cost at various levels of probability in achieving the scheduled completion date. In addition, a system as envisioned would require a unique database which currently does not exist. An objective includes the development of a specification for this database and methodology for database support.
期刊论文(0)
专著(0)
科研奖励(0)
会议论文
Research Initiation: An Alternative Logic Scheduling Technique for Construction Operations
-
批准号:8796187
-
项目类别:Standard Grant
-
资助金额:$4.2万
-
财政年份:1986
-
负责人:James Rowings
-
依托单位:
海外基金