COLLABORATIVE RESEARCH: Sequence of Thrusting and Implications for Mechanical Models of Thrust Belts

合作研究:推力序列及其对推力带机械模型的影响

基本信息

  • 批准号:
    8803734
  • 负责人:
  • 金额:
    $ 6.36万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    1988
  • 资助国家:
    美国
  • 起止时间:
    1988-08-01 至 1991-01-31
  • 项目状态:
    已结题

项目摘要

A recently developed model for thrust belts requires that the thrust wedge deform internally to attain and maintain a critical taper angle during fault development. Although a number of mechanisms are known that would accomplish this, the model has been questioned on the grounds that there is a lack of extensive internal deformation and continuous yielding within thrust belts and that there is evidence that thrusts develop in piggy-back fashion. This study seeks to determine if taper angle-maintaining mechanisms operate in sufficient magnitude to allow the wedge model to function. Fault sequences in both the Rocky Mountains and the southern Appalachians will be studied and sequentially restored from balanced cross-sections and results compared to products predicted from forward modeling with the original section. Results are expected to establish the viability of the wedge model for thrust sheet emplacement.
最近开发的逆冲带模型要求, 止推楔内部变形,以达到并保持临界 断层发育时的锥角。 虽然一些 机制是已知的,将实现这一点,该模型已 被质疑的理由是,缺乏广泛的 冲断带内部变形和连续屈服 而且有证据表明逆冲断层是在 时尚. 本研究旨在确定锥角保持是否 机构在足够的幅度下操作, 模型功能。 洛矶山脉的断层 和阿巴拉契亚山脉南部将被研究, 从平衡横截面恢复,结果与 产品预测从正演模拟与原来的 科. 预计结果将确定 楔体模型

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Peter Geiser其他文献

Peter Geiser的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Peter Geiser', 18)}}的其他基金

Support of Penrose Conference on "The Construction of Geological Cross Sections in Deformed Terrane; Techniques, Assumptions and Methods
支持彭罗斯会议“变形地体地质剖面的构建;技术、假设和方法”
  • 批准号:
    8700386
  • 财政年份:
    1987
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
Collaborative Structural and Geochronologic Investigation OfAlleghenian Deformational Events in the Central and NorthernAppalachian Foreland
阿巴拉契亚前陆中部和北部阿勒格尼变形事件的结构和年代学合作调查
  • 批准号:
    8207355
  • 财政年份:
    1982
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Continuing Grant
Collaborative Research on Solution Cleavage and Strain Partitioning in the Appalachian Foreland Fold Belt
阿巴拉契亚前陆褶皱带溶液解理与应变分配的协同研究
  • 批准号:
    7911085
  • 财政年份:
    1979
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Continuing Grant
Collaborative Research on Solution Cleavage, a Major Deformational Structure in Foreland Fold Belts
前陆褶皱带主要变形结构——溶液解理的协同研究
  • 批准号:
    7714431
  • 财政年份:
    1977
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant

相似国自然基金

Research on Quantum Field Theory without a Lagrangian Description
  • 批准号:
    24ZR1403900
  • 批准年份:
    2024
  • 资助金额:
    0.0 万元
  • 项目类别:
    省市级项目
Cell Research
  • 批准号:
    31224802
  • 批准年份:
    2012
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research
  • 批准号:
    31024804
  • 批准年份:
    2010
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Cell Research (细胞研究)
  • 批准号:
    30824808
  • 批准年份:
    2008
  • 资助金额:
    24.0 万元
  • 项目类别:
    专项基金项目
Research on the Rapid Growth Mechanism of KDP Crystal
  • 批准号:
    10774081
  • 批准年份:
    2007
  • 资助金额:
    45.0 万元
  • 项目类别:
    面上项目

相似海外基金

Collaborative Research: CyberTraining: Implementation:Medium: Modern Course Exemplars infused with Parallel and Distributed Computing for the Introductory Computing Course Sequence
协作研究:网络培训:实施:中:为入门计算课程序列注入并行和分布式计算的现代课程范例
  • 批准号:
    2321017
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
RAPID/Collaborative Research: Advancing Probabilistic Fault Displacement Hazard Assessments by Collecting Perishable Data from the 2023 Turkiye Earthquake Sequence
RAPID/合作研究:通过收集 2023 年土耳其地震序列的易腐烂数据推进概率断层位移危险评估
  • 批准号:
    2330152
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
Collaborative Research: Connecting the sequence logic of RNA splicing to nuclear localization
合作研究:将 RNA 剪接的序列逻辑与核定位联系起来
  • 批准号:
    2246530
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
Collaborative Research: Connecting the sequence logic of RNA splicing to nuclear localization
合作研究:将 RNA 剪接的序列逻辑与核定位联系起来
  • 批准号:
    2246531
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
RAPID/Collaborative Research: Subsurface Characterization of Liquefaction Case Histories from the 2023 Kahramanmaras Earthquake Sequence
快速/协作研究:2023 年卡赫拉曼马拉斯地震序列液化案例历史的地下特征
  • 批准号:
    2338026
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
Collaborative Research: High-resolution imaging of the Elgin-Lugoff earthquake swarm sequence and subsurface structures in South Carolina using a dense seismic nodal array
合作研究:使用密集地震节点阵列对南卡罗来纳州埃尔金-卢戈夫地震群序列和地下结构进行高分辨率成像
  • 批准号:
    2321095
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
Collaborative Research: RAPID: Fault rock and spring sampling of the 2023 Kahramanmaras, Turkey, earthquake sequence ruptures
合作研究:RAPID:2023 年土耳其卡赫拉曼马拉斯地震序列破裂的断层岩和泉水采样
  • 批准号:
    2335077
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
RAPID/Collaborative Research: Subsurface Characterization of Liquefaction Case Histories from the 2023 Kahramanmaras Earthquake Sequence
快速/协作研究:2023 年卡赫拉曼马拉斯地震序列液化案例历史的地下特征
  • 批准号:
    2338025
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
RAPID/Collaborative Research: Advancing Probabilistic Fault Displacement Hazard Assessments by Collecting Perishable Data from the 2023 Turkiye Earthquake Sequence
RAPID/合作研究:通过收集 2023 年土耳其地震序列的易腐烂数据推进概率断层位移危险评估
  • 批准号:
    2330153
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
RAPID/Collaborative Research: Subsurface Characterization of Liquefaction Case Histories from the 2023 Kahramanmaras Earthquake Sequence
快速/协作研究:2023 年卡赫拉曼马拉斯地震序列液化案例历史的地下特征
  • 批准号:
    2338024
  • 财政年份:
    2023
  • 资助金额:
    $ 6.36万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了